GovBidAlerts
← My Opportunities
Tenderopen🌐 Germany507269-2026

Germany – Environmental planning – 10015490-Development of a green corridor project and street design training in Dakar

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Description

Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.

Details

Posted
Jul 22, 2026
Response deadline
Aug 21, 2026, 9:59 PM UTC (31d)
Type
Tender
Category
90712000, 60000000, 60112000, 71311200
Status
open
Buyer
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Jurisdiction
Germany
Reference #
507269-2026
Country
DEU
Tw Mul
Eschborn
Sub Lg
ENG
Deadline
Aug 13, 2026
Form
competition
Ojs
139/2026
Eu
no-eu-funds
Legal
32014L0024
Notice
cn-standard
Dispatch
2026-07-21+02:00
Dps
none
Main
gen-pub
Identifier
Jan 1, 2001
Contract
services, services
Publication
2026-07-22+02:00
Exclusion
exg-natl-bre-nat-law, exg-crim-part, exg-crim-terror, exg-crim-laund, exg-crim-fraud, exg-crim-corrpt, exg-crim-traffick, exg-pmt-bre-tax, exg-pmt-bre-ssc, exg-mis-bre-env-law, exg-mis-bre-soc-law, ex
Classification
90712000, 60000000, 60112000, 71311200, 90712000, 60000000, 60112000, 71311200
Multiple
not-allowed
Renewal
2
Additional
#Bekanntmachungs-ID: CXTRYY6YTTY3D4ZM# All communication takes place in English via communication tool in the project area of the procurement portal.
Place
SEN, SEN
Procedure
a71a2e2f-c1d4-4fa3-baaa-fbda99e1b589
Social
et-eq, gen-eq, hum-right, opp, work-cond, other
Term
The execution conditions result from the information given in the contract notice and the tender documents.
Provided
ted-esen
Requirement
not-requ
Organisation
+49 61967911154017
Reserved
no
Internal
10015490
Selection
slc-stand-other, slc-abil-ref-services, slc-stand-to-avg, slc-stand-other
Duration
MONTH
Electronic
required
Environmental
biodiv-eco, circ-econ, clim-adapt, clim-mitig, pollu-prev, water-mar
Strategic
env-imp, soc-obj
Missing
late-some
Procurement
SomeTenderDocID1
Review
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringem
Execution
performance
Tender
DAY
Other
Aa: pub-undert-cga · Bi: 993-80072-52 · Ia: https://www.giz.de · Nl: 1 · Gpa: true · Bt 14 Lot: non-restricted-document · Bt 21 Lot Eng: 10015490-Development of a green corridor project and street design training in Dakar · Bt 23 Lot: services · Bt 24 Lot Eng: Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public tra · Bt 57 Lot Eng: GIZ may optionally commission contract amendments and/or increases based on the criteria in the tend · Bt 262 Lot: 90712000 · Bt 263 Lot: 60000000, 60112000, 71311200 · Bt 300 Lot Eng: #Besonders auch geeignet für:selbst#, #Besonders auch geeignet für:startup#, #Besonders auch geeigne · Bt 578 Lot: false · Bt 728 Lot Eng: see tender documents · Bt 750 Lot Eng: EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbil · Bt 772 Lot Eng: GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid · Bt 777 Lot Eng: see tender documents, see tender documents · Bt 821 Lot: epo-notice · Bt 5141 Lot: SEN · Bt 13(D) Lot: 2026-08-13+02:00 · Bt 13(T) Lot: 23:59:59+02:00 · Bt 26(A) Lot: cpv, cpv, cpv · Bt 26(M) Lot: cpv · Bt 131(D) Lot: 2026-08-21+02:00 · Bt 131(T) Lot: 12:00:00+02:00 · Bt 701 Notice: 8a2664b1-7345-478e-83d1-d2bf700ab60d · Bt 738 Notice: Jul 20, 2026 · Opp 070 Notice: 16 · Opt 002 Notice: eforms-sdk-1.13 · Bt 05(B) Notice: 09:32:07+02:00 · Bt 24 Procedure Eng: The project Mobilité Verte au Sénégal (MoVe Senegal) is implemented by the Deutsche Gesellschaft für · Opa 36 Lot Number: 12 · Opa 98 Lot Number: 131 · Bt 01(C) Procedure: vgv · Bt 67(B) Procedure Eng: In accordance with §§ 123,124 GWB, § 22 LkSG

Contact

Finding similar opportunities…

This listing is a summary from Germany's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.