open🌐 North Carolina (eVP)83-CFCC2026-1103
HVAC Renovation Phase 4 - McLeod Building/Bldg S - Downtown Campus
CAPE FEAR COMMUNITY COLLEGE
Description
HVAC Renovations Phase 4 - Building S - Design Build Services for selective HVAC renovation of one floor and controls upgrades for another floor at CFCC's Building S - Downtown Campus, Wilmington, NC. Cape Fear Community College is seeking proposals from qualified Design Build HVAC teams to design and construct major HVAC Renovations for this building, located at CFCC’s Wilmington NC Campus. The Existing building is 7 floors, 114,000sf. Desired scope is replacement of VAV’s, hot water coils and control dampers on existing dual deck or multizone HVAC system on one floor (Floor #2) of the building. Also, replace DDC controls on existing AHU’s on the ground floor. Work to include DDC controls, hot water piping from building riser to VAV’s, grilles, outside air dampers and actuators, fire dampers and other required accessories. Upgrade air handlers from starters to VFD’s. Install extended outdoor boiler flues Associated removal and replacement of ceiling grid and tile. One firm will be selected for the entire project.
Details?
- Posted
- Nov 3, 2026
- Response deadline
- Dec 8, 2026, 3:00 PM UTC (35d)
- Status
- open
- Buyer
- CAPE FEAR COMMUNITY COLLEGE
- Jurisdiction
- North Carolina (eVP)
- Reference #
- 83-CFCC2026-1103
- Has Description
- true
- State Code
- 0
- Entity Name
- evp_solicitation
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 112,000+ open bids from 2,500+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from North Carolina (eVP)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.