GovBidAlerts
OpenRFQualInternational

RFQ #2026-14: BF 71315, Construction of Steel Girder Bridge over Athabasca River, Removal of Existing Bridge, Grading, GBC, ACP & Other Work

Transportation and Economic Corridors

Due Closes in 23 daysRef. AB-2026-07716

At a glance

What

The intent of this Request for Qualification (“RFQ”) is to solicit Submissions, in accordance with the requirements described in the RFQ document, from firms interested in providing construction services for: Project ID: RFQ 2026-14 BF…

Category: CNST

Where
Alberta
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Thu, Dec 17, 2026 · 4:00 PM MDT (closes in 23 days)
How to respond
Documents
None attached here — see the source portal

Description

The intent of this Request for Qualification (“RFQ”) is to solicit Submissions, in accordance with the requirements described in the RFQ document, from firms interested in providing construction services for: Project ID: RFQ 2026-14 BF 71315, CONSTRUCTION OF STEEL GIRDER BRIDGE OVER THE ATHABASCA RIVER ON HIGHWAY 33:08, REMOVAL OF EXISTING BRIDGE, GRADING, GRANULAR BASE COURSE, ASPHALTIC CONCRETE PAVEMENT AND OTHER WORK A “qualification based” selection process will be employed for evaluation of RFQ Submissions. Submissions must receive a minimum score of equal to 65% or more of the maximum achievable total score for all evaluation categories in order to be considered for pre-qualification and invited to participate in the Tender process. Following an initial evaluation of Submissions, the Province will establish a list of successful Respondents.
Read more ↓
Only those Respondents notified of being short listed will be invited to participate in the Tender process. The Province reserves the right to issue the Tender at any time during the validity period of the prequalification list, which shall remain valid for a period of up to three (3) years from the RFQ closing date. Alberta Transportation and Economic Corridors (“TEC” or the “Province”) requires construction services for Replacement of the existing BF 71315 bridge carrying Highway 33:08 over the Athabasca River, near Fort Assiniboine, AB. The project delivery method will be Design-Bid-Build.
All notice detailsShow ↓
Posted
Nov 23, 2026
Type
RFQual
Category
CNST
Status
open
Jurisdiction
Alberta (APC)
Location
Alberta
Reference #
AB-2026-07716
Status Order
2
@Search Score
1
Commodity Codes
72101700, 72101704, 72103000, 72103001, 72103003, 72140000, 72141000, 72141001, 72141002, 72141003, 72141104, 72141107, 72141500, 72141507, 72150000
Agreement Type Code
TA-01
Ai Version Keywords
transportation, economic corridors, request for qualification, rfq 2026-14, steel girder bridge, athabasca river, bridge construction, highway 33:08, bridge removal, grading, granular base course, asp
Submission Details
The Province will receive the Submission in electronic PDF file format no later than the RFQ Closing Date and Time as indicated on the cover of the RFQ. This opportunity uses APC E-submission. Respon
Project Description
The intent of this Request for Qualification (“RFQ”) is to solicit Submissions, in accordance with the requirements described in the RFQ document, from firms interested in providing construction servi
Solicitation Number
2026-14
Commodity Code Titles
Concrete work, Foundation or slab work, Site preparation services, Land clearing services, Demolition services, Heavy construction services, Highway and road construction services, Highway and road ne
Opportunity Type Code
OPEN-COMPETITIVE
Amended
No

This listing is a summary from Alberta (APC)'s open procurement data. The full solicitation documents are on the source portal.