closed🌐 pinellasfl25-0601-ITB-C STEP 2
Philippe Park Wastewater Collection System Improvements (PID 000341G) Step 2
pinellasfl / PUBLIC WORKS
Description
Work in this project includes the installation of a new wastewater collection system consisting of approximately 2,800 linear feet of force main and four wastewater pumping stations in Philippe Park that will replace four onsite septic collection systems. The new system will connect to the City of Safety Harbor's wastewater collection system through the existing Lift Station No. 614. In addition, approximately 50 linear feet of the Lift Station No. 614 force main will be replaced at both the Lift Station and the discharge manhole
Details?
- Posted
- Aug 6, 2025
- Response deadline
- Aug 21, 2025, 7:00 PM UTC
- Status
- closed
- Buyer
- pinellasfl
- Department
- PUBLIC WORKS
- Jurisdiction
- pinellasfl
- Reference #
- 25-0601-ITB-C STEP 2
- Summary
- <p>Work in this project includes the installation of a new wastewater collection system consisting of approximately 2,800 linear feet of force main and four wastewater pumping stations in Philippe Par
- Is Paused
- false
- Template Title
- Construction - ITB V2
- Copy Count
- 0
- Government Organization City
- Clearwater
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png
- Government Organization Name
- Pinellas County
- Government Organization State
- FL
- Government Organization Website
- http://www.pinellascounty.org/
- Government Organization Zip Code
- 33765
- Government Organization Address1
- Pinellas County Courthouse Annex Bldg., Sixth Floor
- Government Organization Address2
- 400 S. Ft. Harrison Ave.
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Close Out Reason
- rejected.
- Closed Substatus
- other
Contact
(727)464-3311
Finding similar opportunities…
This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 188101,
"_slug": "pinellasfl",
"title": "Philippe Park Wastewater Collection System Improvements (PID 000341G) Step 2",
"status": "closed",
"summary": "<p>Work in this project includes the installation of a new wastewater collection system consisting of approximately 2,800 linear feet of force main and four wastewater pumping stations in Philippe Park that will replace four onsite septic collection systems. The new system will connect to the City of Safety Harbor's wastewater collection system through the existing Lift Station No. 614. In addition, approximately 50 linear feet of the Lift Station No. 614 force main will be replaced at both the Lift Station and the discharge manhole</p>",
"isPaused": false,
"template": {
"title": "Construction - ITB V2"
},
"addendums": [
{
"id": 84906
},
{
"id": 84682
},
{
"id": 84489
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2025-07-31T19:07:18.427Z",
"department": {
"id": 2010,
"name": "PUBLIC WORKS"
},
"government": {
"code": "pinellasfl",
"organization": {
"city": "Clearwater",
"logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
"name": "Pinellas County",
"phone": "(727)464-3311",
"state": "FL",
"website": "http://www.pinellascounty.org/",
"zipCode": "33765",
"address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
"address2": "400 S. Ft. Harrison Ave.",
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "25-0601-ITB-C STEP 2",
"closeOutReason": "rejected.",
"closedSubstatus": "other",
"proposalDeadline": "2025-08-21T19:00:00.000Z",
"releaseProjectDate": "2025-08-06T14:32:41.095Z"
}