GovBidAlerts
OpenIFBState

I-90, West Easton Road Over I-90 Bridge - Deck Rehabilitation

Washington State DOT

Due Closes in 3 daysRef. XE3779

At a glance

What

Requires scarifying concrete of bridge deck, planing bituminous pavement, modified concrete overlay and curing/finishing concrete bridge deck, hot mix asphalt (HMA) paving, installing guideposts, replacing delineation, erosion control…

Where
WA
Key dates
  • Posted: Oct 19, 2026
  • Deadline: Wed, Dec 2, 2026 · 11:00 AM PST (closes in 3 days)
How to respond
Documents
None attached here — see the source portal

Description

Requires scarifying concrete of bridge deck, planing bituminous pavement, modified concrete overlay and curing/finishing concrete bridge deck, hot mix asphalt (HMA) paving, installing guideposts, replacing delineation, erosion control, temporary traffic control and other work. Involves 30 items and…
All notice detailsShow ↓
Posted
Oct 19, 2026
Type
IFB
Status
open
Jurisdiction
Washington State DOT
Location
WA
Reference #
XE3779
County
Kittitas County
Work Types
Public Works

This listing is a summary from Washington State DOT's open procurement data. The full solicitation documents are on the source portal.