IFBopen🌐 Illinois DOT010-62W83
This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County. (Cook)
Illinois DOT
Description
This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County.
Details?
- Response deadline
- Jun 12, 2026, 12:00 PM UTC
- Type
- IFB
- Status
- Active
- Buyer
- Illinois DOT
- Jurisdiction
- Illinois DOT
- Location
- IL
- Reference #
- 010-62W83
- Bulletin
- This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Ca
- Counties
- Cook
Finding similar opportunities…
This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.