GovBidAlerts
OpenIFBState

I-5, Columbia River Bridge Pre-Completion Tolling Project

Washington State DOT

Due Closes in 47 daysRef. XE3786

At a glance

What

Requires planing bituminous pavement, hot mix asphalt (HMA) paving, installing sign structures, signs, ITS and camera equipment, electrical systems, cement concrete barrier, fencing, delineation, traffic control and other work.

Where
WA
Key dates
  • Posted: Nov 16, 2026
  • Deadline: Wed, Jan 6, 2027 · 11:00 AM PST (closes in 47 days)
How to respond
Documents
None attached here — see the source portal

Description

Requires planing bituminous pavement, hot mix asphalt (HMA) paving, installing sign structures, signs, ITS and camera equipment, electrical systems, cement concrete barrier, fencing, delineation, traffic control and other work. Involves 49 items and 65 working days. Work class 27, signing.
All notice detailsShow ↓
Posted
Nov 16, 2026
Type
IFB
Status
open
Jurisdiction
Washington State DOT
Location
WA
Reference #
XE3786
County
Clark County
Work Types
Public Works

This listing is a summary from Washington State DOT's open procurement data. The full solicitation documents are on the source portal.