closed🌐 mprpdRFP 202526-3
Rancho Cañada Floodplain Restoration Project Construction Management (Phases 2 and 3)
mprpd / Planning & Conservation
Description
The Rancho Cañada Floodplain Restoration Project (Project) is located on the former Rancho Cañada Golf Club property in the Rancho Cañada unit of the Palo Corona Regional Park, Monterey County, California, along the Carmel River. The project site is approximately 185 acres in size and spans both banks of the Carmel River. The Monterey Peninsula Regional Park District (MPRPD, Owner) maintains the former Rancho Cañada Golf Club clubhouse on the property as its offices, and the facility also functions as a visitor’s center and trailhead for the public’s access to the remainder of the 4,350-acre Palo Corona Regional Park to the south. Immediately downstream of MPRPD’s property is the remainder of the former Rancho Cañada Golf Club property, which is now the 60-acre Rancho Cañada Village (RCV) property, a proposed residential development. The Project is focused on restoring a 1-mile section of Carmel River so that natural geomorphic processes will reconnect the river with historic floodplain habitat and create a mosaic of self-sustaining riparian habitat types and instream complexity to benefit juvenile and adult steelhead and other aquatic riparian species. The project area currently serves as a public park and certain amenities/infrastructure are critical for it to continue to function this way. To accomplish the overall goal of the project, the project will remove riprap wherever it is not protecting key infrastructure, recreate historical channel and floodplain features, widen the channel to increase habitat, and add alcoves for backwater habitats. Approximately 40-acres of connected floodplains will be created. These new floodplains will be revegetated with native plants and will require an irrigation system to be constructed, maintained, and disposed of at the end of the planting establishment period. The irrigation system will include replacement of the driving range well pump. Existing large mature trees are left in place to the greatest extent possible, and existing vegetation that must be removed will be reused as large wood habitat features in the newly created floodplains. Three existing bridges that cross the Carmel River will be removed, with one new replacement bridge added in a location sited to minimize its constraint on the river. The Construction Manager shall serve as the Owner’s Designated representative, and as the key point of contact between the construction contractor, the Owner, the design engineer, biological monitors, and other consultants. The Construction Manager shall assist the Owner with financial and grant management, invoicing, progress reports, grant reporting, construction management, coordination between consultants, construction contractor, and Owner, and structural tests and inspections for the new pedestrian bridge.
Details?
- Posted
- Feb 18, 2026
- Response deadline
- Mar 16, 2026, 7:00 PM UTC
- Status
- closed
- Buyer
- mprpd
- Department
- Planning & Conservation
- Jurisdiction
- mprpd
- Reference #
- RFP 202526-3
- Summary
- <p>The Rancho Cañada Floodplain Restoration Project (Project) is located on the former Rancho Cañada Golf Club property in the Rancho Cañada unit of the Palo Corona Regional Park,
- Is Paused
- false
- Template Title
- Request for Proposal
- Copy Count
- 0
- Government Organization City
- Carmel
- Government Organization Logo
- https://assets.procurement.opengov.com/logos/MPRPD.png
- Government Organization Name
- Monterey Peninsula Regional Park District
- Government Organization State
- CA
- Government Organization Website
- www.mprpd.org
- Government Organization Zip Code
- 93923
- Government Organization Address1
- 4860 Carmel Valley Road
- Government Organization Address2
- PO Box 223340
- Government Organization Timezone
- America/Los_Angeles
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Finding similar opportunities…
This listing is a summary from mprpd's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 238367,
"_slug": "mprpd",
"title": "Rancho Cañada Floodplain Restoration Project Construction Management (Phases 2 and 3)",
"status": "closed",
"summary": "<p>The Rancho Cañada Floodplain Restoration Project (Project) is located on the former Rancho Cañada Golf Club property in the Rancho Cañada unit of the Palo Corona Regional Park, Monterey County, California, along the Carmel River. The project site is approximately 185 acres in size and spans both banks of the Carmel River. The Monterey Peninsula Regional Park District (MPRPD, Owner) maintains the former Rancho Cañada Golf Club clubhouse on the property as its offices, and the facility also functions as a visitor’s center and trailhead for the public’s access to the remainder of the 4,350-acre Palo Corona Regional Park to the south. Immediately downstream of MPRPD’s property is the remainder of the former Rancho Cañada Golf Club property, which is now the 60-acre Rancho Cañada Village (RCV) property, a proposed residential development.</p><p>The Project is focused on restoring a 1-mile section of Carmel River so that natural geomorphic processes will reconnect the river with historic floodplain habitat and create a mosaic of self-sustaining riparian habitat types and instream complexity to benefit juvenile and adult steelhead and other aquatic riparian species. The project area currently serves as a public park and certain amenities/infrastructure are critical for it to continue to function this way.</p><p>To accomplish the overall goal of the project, the project will remove riprap wherever it is not protecting key infrastructure, recreate historical channel and floodplain features, widen the channel to increase habitat, and add alcoves for backwater habitats. Approximately 40-acres of connected floodplains will be created. These new floodplains will be revegetated with native plants and will require an irrigation system to be constructed, maintained, and disposed of at the end of the planting establishment period. The irrigation system will include replacement of the driving range well pump. Existing large mature trees are left in place to the greatest extent possible, and existing vegetation that must be removed will be reused as large wood habitat features in the newly created floodplains. Three existing bridges that cross the Carmel River will be removed, with one new replacement bridge added in a location sited to minimize its constraint on the river.</p><p>The Construction Manager shall serve as the Owner’s Designated representative, and as the key point of contact between the construction contractor, the Owner, the design engineer, biological monitors, and other consultants. The Construction Manager shall assist the Owner with financial and grant management, invoicing, progress reports, grant reporting, construction management, coordination between consultants, construction contractor, and Owner, and structural tests and inspections for the new pedestrian bridge.</p>",
"isPaused": false,
"template": {
"title": "Request for Proposal"
},
"addendums": [
{
"id": 105658
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2026-02-18T04:40:23.999Z",
"department": {
"id": 1938,
"name": "Planning & Conservation"
},
"government": {
"code": "mprpd",
"organization": {
"city": "Carmel",
"logo": "https://assets.procurement.opengov.com/logos/MPRPD.png",
"name": "Monterey Peninsula Regional Park District",
"phone": null,
"state": "CA",
"website": "www.mprpd.org",
"zipCode": "93923",
"address1": "4860 Carmel Valley Road",
"address2": "PO Box 223340",
"phoneExt": null,
"timezone": "America/Los_Angeles",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "RFP 202526-3",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2026-03-16T19:00:00.000Z",
"releaseProjectDate": "2026-02-18T08:00:00.000Z"
}