GovBidAlerts
OpenState

Frio City Road Outfall Phase 1 (Pendleton Ave. from S. Brazos to San Pedro Creek) (2022 Bond)

M0152

Due Closes in 45 daysRef. 23-03933

At a glance

What

Project scope includes the installation of a 9’x9’ box culvert along Pendleton Ave, along a new drainage easement passing through the Artisan at Creekside apartment complex, and under S. San Marcos St. that outfalls directly into San…

Where
Texas (ESBD)
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Fri, Jan 8, 2027 (closes in 45 days)
How to respond

Description

Project scope includes the installation of a 9’x9’ box culvert along Pendleton Ave, along a new drainage easement passing through the Artisan at Creekside apartment complex, and under S. San Marcos St. that outfalls directly into San Pedro Creek. Installation of this underground storm drain system will include associated roadway reconstruction, curbs, sidewalks and driveway approaches within the project limits. Scope also includes SAWS Water, SAWS Sewer and CPS Gas improvements.

Documents (1)

  • 📎 media.nl
    application/pdf · 116 KB
    Download
All notice detailsShow ↓
Posted
Nov 23, 2026
Status
open
Jurisdiction
Texas (ESBD)
Reference #
23-03933
Source Status
Posted

This listing is a summary from Texas (ESBD)'s open procurement data. The full solicitation documents are on the source portal.