open🌐 RFPMart: Plane & Aircraft Services Supplies Components Accessories / Related ...http://www.rfpmart.com/1192495-us-fed-production-of-small-unmanned-aircraft-systems-suas-lethality-payloads-at-pine-bluff-arsenal.html
US-FED-00000398564 - Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal - Deadline December 14,2026
Description
30 OCT 2026The response due date is 4:00 PM CST on 14 DEC 2026. Submit responses to this request for partnership solutions to [email? redacted] and [email? redacted] with subject line: PSO Response Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal (PBA).Partnership Solutions Opening Request for WhitepapersAgency: Department of War (DoW) / Army Materiel Command (AMC) Notice Type: Partnership Solutions Opening (PSO)Title: Production of sUAS Lethality Payloads at PBA.1.0 INTRODUCTION & AUTHORITYThe U.S. Army Materiel Command (AMC) is issuing this request for partnership solutions via white paper submission solely for market research, planning, and concept exploration regarding a potential Public–Private Partnership (P3) under the authority of 10 U.S.C. 7544.The Government is requesting specific conceptual solutions on how to optimally structure and execute P3 Cooperative Arrangements. The core objective is to leverage private investment to modernize Government facilities to Industry 4.0 and 5.0 automation standards. Industry 4.0 is defined as the Fourth Industrial Revolution, is characterized by the “Smart Factory.“ It aims to create highly efficient, autonomous production lines by integrating cyber–physical systems with the Internet of Things (IoT) and cloud computing. Industry 5.0 is not meant to replace Industry 4.0 but to refine it. It recognizes that pure automation can overlook human creativity and environmental impact. It places the well–being of the worker and the planet at the center of the industrial process. This modernization will enable authorized co–production and facility–use activities that mutually benefit the Government`s national security mission and the private partner`s commercial enterprise.Disclaimer: This PSO does not constitute a Request for Proposals (RFP), nor is it a procurement action governed by the Federal Acquisition Regulation (FAR). The Government is not obligated to enter into any cooperative arrangement or agreement because of this PSO and will not reimburse respondents for any costs associated with submitting a response.2.0 PROBLEM STATEMENTPBA is requesting a commercial partnership to support the development and production of lethal energetic payloads for sUAS and Electronic Safe & Arming Devices (ESAD). These efforts include scaling low–cost, modernized sUAS lethality and energetic payload manufacturing. PBA intends for flexible production lines with ability to accommodate modular manufacturing capabilities for differing explosives, varying payload sizes, explosive safe and arming devices, energetic airframes, etc.PBA can provide both logistical and facility support, including approximately 100,000 square feet of storage and production capacity. The government has various 1 or 2 story buildings available in area 34–000 ranging in size from 396 sq ft to 13,551 sq ft with various existing capabilities to include electricity, water, air sewer, Natural Gas, and/or steam. Additional building details provided in Attachment 1.The production facilities were constructed in 1941–42 for the war effort to handle highly volatile chemical, pyrotechnic, and incendiary compounds. Structurally and architecturally, these buildings reflect a combination of standardized strict hazard segmentation, and fortified safety engineering. Buildings are constructed with heavy, reinforced concrete interior blast walls and thick foundations, but with deliberately weak, lightweight exterior walls and roofs.PBA can provide the following support:Direct laborEngineeringBase operationsLogistical supportEnvironmental and safety support, including leveraging PBA`s existing Explosive Site Safety Plans to expedite the mandatory joint site–licensing updates required for the partner`s specific energetic footprint and, as applicable, for any non–Department of Defense owned toxic or hazardous materials, supporting Government coordination and processing of a 10 U.S.C. 2692 exception request; the contractor remains responsible for providing the technical, environmental, safety, and operational information required to support that request.Utilities: Existing utility systems vary by facility as shown in Attachment 1. The contractor is responsible for any necessary capital investments required to utilize these utilities, including the procurement and installation of utility meters, sub–meters, service hookups, and distribution lines.
Details?
- Posted
- Oct 30, 2026
- Response deadline
- Dec 14, 2026, 11:59 PM UTC (44d)
- Status
- open
- Jurisdiction
- RFPMart: Plane & Aircraft Services Supplies Components Accessories / Related ...
- Has Description
- true
- Item
- US-FED-00000398564 - Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal - Deadline December 14,2026 30 OCT 2026The respons
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 115,000+ open bids from 2,500+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from RFPMart: Plane & Aircraft Services Supplies Components Accessories / Related ...'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.