Manchester International Airport - Shotcrete works
Kier Transportation - CP7 NWC
Description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.
Details?
- Posted
- Oct 6, 2026
- Response deadline
- Oct 16, 2026, 4:00 PM UTC (7d)
- Category
- works
- Status
- active
- Estimated value
- GBP 500,000
- Buyer
- Kier Transportation - CP7 NWC
- Jurisdiction
- United Kingdom (Contracts Finder)
- Start date
- Feb 10, 2027
- End date
- Jul 27, 2027
- Reference #
- C4N120562379
- Has Description
- true
- Country
- United Kingdom
- Tender Value Currency
- GBP
- Tender Min Value Amount
- 250000
- Tender Description
- The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Th
- Tender Classification Scheme
- CPV
- Tender Classification Description
- Ready-mixed concrete
Contact
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 114,000+ open bids from 2,500+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from United Kingdom (Contracts Finder)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.