closed🌐 gruRFP-2024-010
138 KV Oil Breaker Replacements Project
gru / Energy Delivery
Description
GRU is working towards replacing all of our existing 138kV oil circuit breakers (OCB) with new 138kV SF6 breakers. GRU currently has 31 OCBs in service and plans to replace 4-6 breakers per year. GRU will provide the new 138kV SF6 (Siemens) breakers for each project. Typical project scope information and drawings have been included as part of this specification. High level, the scope for each breaker replacement will include the following: Engineering design Procurement of all needed material except the new 138kV SF6 breakers Modifying the existing OCB foundations while the breakers are still in service Installing/modifying conduits Replacement of control cables Removal and disposal of the existing 138kV oil circuit breaker and associated mineral oil. Install of new 138kV SF6 breaker Finalizing all project documentation and drawings associated with the project GRU also intends to utilize this specification for the replacement of any 138kV SF6 breakers that are in need of replacement. The Contractor shall furnish all labor, equipment and material (unless indicated provided by GRU), tools, transportation, supervision and any other services necessary to complete the work in accordance with the attached drawings and these specifications. The Contractor shall not take advantage of any apparent errors and/or omissions discovered in the drawings, but immediately notify the GRU Company Representative of such discovery. Once notified, the GRU project representative will then make such corrections and interpretations as necessary to reflect the actual spirit and intent of the drawings and specifications. Deviations from this specification or referenced documents shall not be made without written approval from the GRU contact or his designee.
Details?
- Posted
- Nov 8, 2023
- Response deadline
- Dec 12, 2023, 7:00 PM UTC
- Status
- closed
- Buyer
- gru
- Department
- Energy Delivery
- Jurisdiction
- gru
- Reference #
- RFP-2024-010
- Summary
- <p style="margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;"><span style="font-size: 10.0pt;">GRU is working towards replacing all of our existing 138kV oil circuit breakers (OCB) wit
- Is Paused
- false
- Template Title
- Solicitation for Goods and Service
- Copy Count
- 1
- Government Organization City
- Gainesville
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/1f1e1c7e-6901-4fa6-b0e3-163a5553b4cb_gru_logo.jpg
- Government Organization Name
- Gainesville Regional Utilities
- Government Organization State
- FL
- Government Organization Website
- https://www.gru.com/WorkWithGRU.aspx
- Government Organization Zip Code
- 32601
- Government Organization Address1
- 301 SE 4th Avenue
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Closed Substatus
- awarded
Contact
(352)393-1240
Finding similar opportunities…
This listing is a summary from gru's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 64475,
"_slug": "gru",
"title": "138 KV Oil Breaker Replacements Project",
"status": "closed",
"summary": "<p style=\"margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">GRU is working towards replacing all of our existing 138kV oil circuit breakers (OCB) with new 138kV SF6 breakers. GRU currently has 31 OCBs in service and plans to replace 4-6 breakers per year. GRU will provide the new 138kV SF6 (Siemens) breakers for each project. Typical project scope information and drawings have been included as part of this specification. High level, the scope for each breaker replacement will include the following:</span></p><ul style=\"margin-top: 12.0pt; margin-bottom: 12.0pt;\"><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Engineering design</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Procurement of all needed material <strong>except</strong> the new 138kV SF6 breakers</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Modifying the existing OCB foundations while the breakers are still in service</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Installing/modifying conduits</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Replacement of control cables</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Removal and disposal of the existing 138kV oil circuit breaker and associated mineral oil. </span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Install of new 138kV SF6 breaker</span></li><li style=\"margin: 12pt 0in 12pt 48px; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Finalizing all project documentation and drawings associated with the project</span></li></ul><p style=\"margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">GRU also intends to utilize this specification for the replacement of any 138kV SF6 breakers that are in need of replacement.</span></p><p style=\"margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">The Contractor shall furnish all labor, equipment and material (unless indicated provided by GRU), tools, transportation, supervision and any other services necessary to complete the work in accordance with the attached drawings and these specifications. </span></p><p style=\"margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">The Contractor shall not take advantage of any apparent errors and/or omissions discovered in the drawings, but immediately notify the GRU Company Representative of such discovery. Once notified, the GRU project representative will then make such corrections and interpretations as necessary to reflect the actual spirit and intent of the drawings and specifications. </span></p><p style=\"margin: 12pt 0in 12pt 0.5in; line-height: normal; font-size: 11pt;\"><span style=\"font-size: 10.0pt;\">Deviations from this specification or referenced documents shall not be made without written approval from the GRU contact or his designee.</span></p>",
"isPaused": false,
"template": {
"title": "Solicitation for Goods and Service"
},
"addendums": [
{
"id": 27865
},
{
"id": 28189
},
{
"id": 27127
}
],
"copyCount": 1,
"isPrivate": false,
"comingSoon": false,
"created_at": "2023-10-16T11:54:11.320Z",
"department": {
"id": 4729,
"name": "Energy Delivery"
},
"government": {
"code": "gru",
"organization": {
"city": "Gainesville",
"logo": "https://assets.procurement.opengov.com/logo-uploads/1f1e1c7e-6901-4fa6-b0e3-163a5553b4cb_gru_logo.jpg",
"name": "Gainesville Regional Utilities",
"phone": "(352)393-1240",
"state": "FL",
"website": "https://www.gru.com/WorkWithGRU.aspx",
"zipCode": "32601",
"address1": "301 SE 4th Avenue",
"address2": null,
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "RFP-2024-010",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2023-12-12T19:00:00.000Z",
"releaseProjectDate": "2023-11-08T14:51:52.919Z"
}