Project Description: This project will employ the Cured-in-place pipe (CIPP) installation methods: 1) Fiberglass lining installation with ultraviolet light, and 2) Felt lining installation with steam or water (thermal cured) to rehabilitate approximately 64,000 lineal feet of existing sanitary sewer, combined sewer and storm pipes at various locations in Seattle. The mainline pipes being rehabilitated are 6 inches to 27 inches in diameter. This Project consists of the following elements of work (but not limited to): traffic control, bypass pumping, cleaning and pre-construction closed circuit television (CCTV) video inspection of sewer pipe, removal of debris, removal of intruding lateral piping and other obstructions, installing pre-liners, installing and molding cured-in-place pipe (CIPP) liners to host pipes, reinstatement of laterals, and post-construction CCTV inspection. This Project is a Covered Project subject to the City of Seattle’s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city’s construction projects. It gives contractors access to these skilled workers. Engineer's Estimate: $10,130,000.00 Project Location: This Project consists of 263 pipe segments for sewer mainline Cured-in-place pipe (CIPP) repairs located at various locations within the City of Seattle.

Details

Posted
Mar 5, 2026
Response deadline
Apr 15, 2026, 9:00 PM UTC
Status
closed
Buyer
seattle
Department
Public Works
Jurisdiction
seattle
Reference #
PW#2025-066
Summary
<p><strong>Project Description: </strong>This project will employ the Cured-in-place pipe (CIPP) installation methods: 1) Fiberglass lining installation with ultraviolet light, and 2) Felt lining inst
Is Paused
false
Template Title
Solicitation (Attach a Document) - Construction
Copy Count
0
Government Organization Name
City of Seattle
Government Organization State
WA
Government Organization Website
http://seattle.gov/
Government Organization Zip Code
98104
Government Organization Address1
700 5th Ave
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1

Contact

(206)684-3000
Finding similar opportunities…

This listing is a summary from seattle's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 242921,
  "_slug": "seattle",
  "title": "Sewer MA Lining Contract 1",
  "status": "awardPending",
  "summary": "<p><strong>Project Description: </strong>This project will employ the Cured-in-place pipe (CIPP) installation methods: 1) Fiberglass lining installation with ultraviolet light, and 2) Felt lining installation with steam or water (thermal cured) to rehabilitate approximately 64,000 lineal feet of existing sanitary sewer, combined sewer and storm pipes at various locations in Seattle. The mainline pipes being rehabilitated are 6 inches to 27 inches in diameter. This Project consists of the following elements of work (but not limited to): traffic control, bypass pumping, cleaning and pre-construction closed circuit television (CCTV) video inspection of sewer pipe, removal of debris, removal of intruding lateral piping and other obstructions, installing pre-liners, installing and molding cured-in-place pipe (CIPP) liners to host pipes, reinstatement of laterals, and post-construction CCTV inspection.</p><p>This Project is a Covered Project subject to the City of Seattle&rsquo;s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city&rsquo;s construction projects. It gives contractors access to these skilled workers.</p><p><strong>Engineer's Estimate: </strong>$10,130,000.00</p><p><strong>Project Location: </strong>This Project consists of 263 pipe segments for sewer mainline Cured-in-place pipe (CIPP) repairs located at various locations within the City of Seattle.</p>",
  "isPaused": false,
  "template": {
    "title": "Solicitation (Attach a Document) - Construction"
  },
  "addendums": [
    {
      "id": 109185
    },
    {
      "id": 110522
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2026-03-04T15:39:46.765Z",
  "department": {
    "id": 6913,
    "name": "Public Works"
  },
  "government": {
    "code": "seattle",
    "organization": {
      "city": "Seattle",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/92aad1bc-03e8-4f0e-995d-ba5c433e3b44_image001.png",
      "name": "City of Seattle",
      "phone": "(206)684-3000",
      "state": "WA",
      "website": "http://seattle.gov/",
      "zipCode": "98104",
      "address1": "700 5th Ave",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "PW#2025-066",
  "closeOutReason": null,
  "closedSubstatus": null,
  "proposalDeadline": "2026-04-15T21:00:00.000Z",
  "releaseProjectDate": "2026-03-05T08:00:00.000Z"
}