open🌐 RFPMart: USA (all categories)http://www.rfpmart.com/1156126-us-fed-sources-soughtmarket-intelligence-fort-hunter-liggett-barracks-potential-use-of-progressive-design-build-using-other-transacti.html
US-FED-00000389588 - Sources Sought/Market Intelligence: Fort Hunter-Liggett Barracks Potential Use of Progressive Design Build using Other Transacti - Deadline August 20,2026
Description
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICENotice: This is a Request for Information (RFI) for market research and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm`s ability to submit a proposal should a formal solicitation be issued in the future.NAICS Code: 236220 Commercial and Institutional Building Construction(Note: While Other Transaction Authority is not subject to FAR–based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)Small Business Size Standard: $45 MillionPROJECT OVERVIEWThe U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to demolish and dispose of five (5) existing Barracks and replacing with four (4) CTE Barracks and one (1) AST Barracks. Key features of the project may include:Design and construct four (4) multi–story CTE Barracks (approximately 46,000 total SF each), which will feature open bays, along with integrated officers sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment.Design and construct one (1) multi–story AST Barracks (approximately 45,000 total SF), which will feature sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment.Demolish and dispose of five (5) existing multi–story Barracks (approximately 39,000 total SF each).Estimated Acquisition Magnitude: $200,000,000.00Planned Acquisition Strategy: Progressive Design–Build (PDB) via Other Transaction Authority (OTA)The Government is considering utilizing an Other Transaction (OT) Agreement for a prototype project under the authority of 10 U.S.C. § 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design–Build (PDB).Phase 1 (Design & Pre–Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open–book cost estimating, and mitigate project risks.Phase 2 (Construction): Upon reaching an agreed–upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an “off–ramp“ to complete the design and construct the facility via alternative methods.INFORMATION REQUESTED1. Company Profile:Firm Name, Address, and Point of Contact (Name, Title).Phone Number, Email Address, and Unique Entity ID (UEI).Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.).
Details?
- Posted
- Aug 9, 2026
- Response deadline
- Aug 20, 2026, 11:59 PM UTC (11d)
- Status
- open
- Jurisdiction
- RFPMart: USA (all categories)
- Has Description
- true
- Item
- US-FED-00000389588 - Sources Sought/Market Intelligence: Fort Hunter-Liggett Barracks Potential Use of Progressive Design Build using Other Transacti - Deadline August 20,2026 <d
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 136,000+ open bids from 2,300+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from RFPMart: USA (all categories)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.