ClosedState
I95 Well
Town of St. George
No response deadline publishedRef. 10062026
At a glance
- What
Remove the existing pump.
- Where
- South Carolina (SCBO)
- Key dates
- Posted: Oct 6, 2026
- Deadline: Not published
- How to respond
Submit through the buyer's portal ↗ · how to bid
- Documents
- None attached here — see the source portal
Description
Remove the existing pump. New submersible assembly. Furnish and install a Grundfos 385S400-6B-6, 8-inch, six-stage pump end with a 40 HP SME, 230-volt, three-phase submersible motor. Include 150 feet of 4-inch Schedule 40 galvanized threaded-and-coupled drop pipe. New VFD. Furnish, mount, connect and program a Grundfos CUE VFD. Install and set the new assembly connect to the existing discharge piping and VFD, and perform startup and operational testing. Email in bid no later than Oct 21 by noon.
All notice detailsShow ↓
- Posted
- Oct 6, 2026
- Status
- closed
- Jurisdiction
- South Carolina (SCBO)
- Reference #
- 10062026
- Contact
- St George Water Department
This listing is a summary from South Carolina (SCBO)'s open procurement data. The full solicitation documents are on the source portal.