IFBclosed🌐 Virginia (eVA)IFB-11-17
Pump Station Upgrade
Frederick County Sanitation Authority
Description
The upgrade the 75HP duplex suction lift pump station will consist of new programmable logic controller, new variable frequency drives, a new stand-by diesel generator, electrical upgrades, as well as new roof mounted solar panels.
Details?
- Posted
- Dec 19, 2011
- Response deadline
- Feb 7, 2012, 2:30 PM UTC
- Type
- IFB
- Category
- Construction
- Status
- closed
- Buyer
- Frederick County Sanitation Authority
- Jurisdiction
- Virginia (eVA)
- Location
- 303 Eddy's Lane, Winchester, Frederick County, Virginia
- Reference #
- IFB-11-17
- App
- VBO
- Agency
- LA19
- Doctype
- SO
- Version
- 1
- Commcode
- 91345, 91223, 91360
- Commdesc
- Construction, Sewer and Storm Drain,Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.),Construction, Water System/Plants, Main and Service Line
- Longdesc
- The upgrade the 75HP duplex suction lift pump station will consist of new programmable logic controller, new variable frequency drives, a new stand-by diesel generator, electrical upgrades, as well as
- Doccddesc
- Invitation for Bids (IFB)
- Commlinedesc
- []
- Lastupdatedate
- Oct 13, 2018
Contact
Connie Morrison-Henry
Finding similar opportunities…
This listing is a summary from Virginia (eVA)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": "VBO:IFB:LA19:74686",
"app": "VBO",
"doccd": "IFB",
"agency": "LA19",
"status": "Closed",
"doctype": "SO",
"pubdate": "2011-12-19T12:30:00Z",
"version": "1",
"workloc": "303 Eddy's Lane, Winchester, Frederick County, Virginia",
"category": "Construction",
"commcode": [
"91345, 91223, 91360"
],
"commdesc": [
"Construction, Sewer and Storm Drain,Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.),Construction, Water System/Plants, Main and Service Line"
],
"longdesc": "The upgrade the 75HP duplex suction lift pump station will consist of new programmable logic controller, new variable frequency drives, a new stand-by diesel generator, electrical upgrades, as well as new roof mounted solar panels. ",
"_version_": 1747861000703443000,
"buyername": "Connie Morrison-Henry",
"closedate": "2012-02-07T14:30:00Z",
"doccddesc": "Invitation for Bids (IFB)",
"docdeptcd": "LA19",
"shortdesc": "Pump Station Upgrade",
"agencyname": "Frederick County Sanitation Authority",
"externalid": "IFB-11-17",
"internalid": "74686",
"commlinedesc": [
"[]"
],
"lastupdatedate": "2018-10-13T03:05:37Z",
"categoryshortdesc": "Construction",
"openresponsesdate": "2012-02-07T14:30:00Z"
}