GovBidAlerts
OpenRFPLocalSLBE Requirement: None

Refurbishment of QTA Underground Storage Tanks and Sumps, DCA

Metropolitan Washington Airports Authority

Due Closes in 43 daysRef. RFP-26-26867

At a glance

What

The Contractor shall furnish all labor, material, tools, supplies, transportation, and equipment necessary to reline and refurbish the underground storage gasoline tanks and repair or replace the associated sumps at the Quick Turn-Around…

Category: Construction

Who can bid
SLBE Requirement: None
Where
Metropolitan Washington Airports Authority
Key dates
  • Posted: Nov 25, 2026
  • Deadline: Fri, Jan 8, 2027 (closes in 43 days)
How to respond
Documents
None attached here — see the source portal

Description

The Contractor shall furnish all labor, material, tools, supplies, transportation, and equipment necessary to reline and refurbish the underground storage gasoline tanks and repair or replace the associated sumps at the Quick Turn-Around (QTA) Rental Car Facility at Ronald Reagan Washington National Airport (DCA).
All notice detailsShow ↓
Posted
Nov 25, 2026
Type
RFP
Category
Construction
Status
open
Set-aside
SLBE Requirement: None
Jurisdiction
Metropolitan Washington Airports Authority
Reference #
RFP-26-26867
Heading
RFP-26-26867: Refurbishment of QTA Underground Storage Tanks and Sumps, DCA

This listing is a summary from Metropolitan Washington Airports Authority's open procurement data. The full solicitation documents are on the source portal.