GovBidAlerts
← My Opportunities
closed🌐 garysan2026-RFQ-032

27th Chase Lift Station HVAC Drywell

garysan / Engineering

Description

Project: 27th & Chase Drywell – HVAC Installation Location: Gary Sanitary District – 27th & Chase Facility Requesting Department: Operations / Facilities Requested By:David L Walton Date: March 20, 2026 1. PROJECT OVERVIEW This requisition is for the installation of a complete HVAC system within the drywell structure at the 27th & Chase facility. The work includes mechanical, electrical, structural, and controls integration in a high-risk, gas-prone wastewater environment. All work shall comply with OSHA, IDEM, NEC, and applicable local/state codes, including hazardous location requirements. 2. SCOPE OF WORK A. HVAC EQUIPMENT INSTALLATION Install (1) 5-ton air handler unit with electric heat kit (equipment provided by Gary Sanitary District) Install (1) 5-ton condenser unit (provided by Gary Sanitary District) Full system integration and operational setup B. ELECTRICAL INSTALLATION Install dedicated 50-amp circuit for air handler heat kit Install 30-amp electrical service for condenser unit (120/24/240 VAC) Provide and install: Electrical disconnects Breakers Safety shutoffs Control transformers and wiring All electrical components shall be: Explosion-proof / hazardous-location rated (NEMA compliant) Suitable for environments containing: Hydrogen Sulfide (H₂S) Oxygen-enriched atmospheres Lower Explosive Limit (LEL) gases Carbon Monoxide (CO) C. MECHANICAL & REFRIGERATION WORK Install refrigerant line set, including: Proper sizing Insulation Protection and routing Install condensate drain system, including: Proper slope Corrosion-resistant piping Safe discharge routing D. CONTROLS & THERMOSTAT Install Wi-Fi-enabled thermostat (provided by Gary Sanitary District) Complete: Low-voltage wiring Control integration System programming and commissioning E. FRESH AIR INTAKE SYSTEM Install dedicated fresh air intake: Routed to exterior Properly sealed and protected Designed to prevent gas infiltration F. STRUCTURAL & INSTALLATION COMPONENTS Equipment mounting and installation including: Bracketing Anchoring systems Vibration isolation Perform masonry penetrations as required Seal and reinforce all penetrations per code G. ROOF & DEMOLITION WORK Remove (2) existing RTU units Close and seal existing roof curb openings: Weatherproofing Structural integrity restoration H. STARTUP & COMMISSIONING Complete full system startup and testing Verify: Cooling performance Electrical operation Control functionality Provide commissioning documentation 3. ENVIRONMENTAL & SAFETY REQUIREMENTS This project is located in a classified hazardous wastewater environment, including drywell and wet well areas. A. HAZARDOUS LOCATION REQUIREMENTS All equipment and electrical components must meet: Explosion-proof standards NEMA-rated enclosures for hazardous gases Contractor must verify classification requirements before installation B. OSHA COMPLIANCE Confined space entry procedures required Continuous gas monitoring (H₂S, LEL, O₂, CO) Lockout/Tagout (LOTO) required PPE for hazardous atmospheres mandatory C. IDEM REQUIREMENTS All work within drywell and wet well environments must comply with: Indiana Department of Environmental Management (IDEM) standards Contractor must ensure: No contamination of wastewater systems Proper handling of condensate and drainage Protection of process integrity 4. CONTRACTOR RESPONSIBILITIES Provide all labor, supervision, tools, and incidental materials Coordinate with Gary Sanitary District personnel Maintain site safety and compliance at all times Protect all existing infrastructure and systems Remove debris and maintain clean worksite 5. SPECIAL CONSIDERATIONS (CRITICAL) This is a high-gas, volatile environment—failure to use proper rated equipment will result in rejection System must be designed to prevent ignition sources Downtime and disruption to operations must be minimized All penetrations and installations must maintain gas-tight integrity 6. DELIVERABLES Fully installed and operational HVAC system Electrical and control system integration Startup and commissioning report As-built documentation (if required)

Details

Posted
Mar 20, 2026
Response deadline
Apr 3, 2026, 5:00 PM UTC
Status
closed
Buyer
garysan
Department
Engineering
Jurisdiction
garysan
Reference #
2026-RFQ-032
Summary
<p>Project: 27th &amp; Chase Drywell &ndash; HVAC Installation<br>Location: Gary Sanitary District &ndash; 27th &amp; Chase Facility<br>Requesting Department: Operations / Facilities<br>Requested By:D
Is Paused
false
Template Title
Request for Quotes (Final)
Copy Count
0
Government Organization City
Gary
Government Organization Name
Gary Sanitary District
Government Organization State
IN
Government Organization Website
https://garysanitary.com/
Government Organization Zip Code
46406
Government Organization Address1
3600 West 3rd Avenue
Government Organization Timezone
America/Chicago
Government Organization Country Code
US
Government Organization Phone Country
1

Contact

(219)944-0595
Finding similar opportunities…

This listing is a summary from garysan's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 248592,
  "_slug": "garysan",
  "title": "27th Chase Lift Station HVAC Drywell",
  "status": "pending",
  "summary": "<p>Project: 27th &amp; Chase Drywell &ndash; HVAC Installation<br>Location: Gary Sanitary District &ndash; 27th &amp; Chase Facility<br>Requesting Department: Operations / Facilities<br>Requested By:David L Walton&nbsp;<br>Date: March 20, 2026<br>1. PROJECT OVERVIEW</p><p>This requisition is for the installation of a complete HVAC system within the drywell structure at the 27th &amp; Chase facility. The work includes mechanical, electrical, structural, and controls integration in a high-risk, gas-prone wastewater environment.</p><p>All work shall comply with OSHA, IDEM, NEC, and applicable local/state codes, including hazardous location requirements.</p><p>2. SCOPE OF WORK<br>A. HVAC EQUIPMENT INSTALLATION</p><p>Install (1) 5-ton air handler unit with electric heat kit (equipment provided by Gary Sanitary District)</p><p>Install (1) 5-ton condenser unit (provided by Gary Sanitary District)</p><p>Full system integration and operational setup</p><p>B. ELECTRICAL INSTALLATION</p><p>Install dedicated 50-amp circuit for air handler heat kit</p><p>Install 30-amp electrical service for condenser unit (120/24/240 VAC)</p><p>Provide and install:</p><p>Electrical disconnects</p><p>Breakers</p><p>Safety shutoffs</p><p>Control transformers and wiring</p><p>All electrical components shall be:</p><p>Explosion-proof / hazardous-location rated (NEMA compliant)</p><p>Suitable for environments containing:</p><p>Hydrogen Sulfide (H₂S)</p><p>Oxygen-enriched atmospheres</p><p>Lower Explosive Limit (LEL) gases</p><p>Carbon Monoxide (CO)</p><p>C. MECHANICAL &amp; REFRIGERATION WORK</p><p>Install refrigerant line set, including:</p><p>Proper sizing</p><p>Insulation</p><p>Protection and routing</p><p>Install condensate drain system, including:</p><p>Proper slope</p><p>Corrosion-resistant piping</p><p>Safe discharge routing</p><p>D. CONTROLS &amp; THERMOSTAT</p><p>Install Wi-Fi-enabled thermostat (provided by Gary Sanitary District)</p><p>Complete:</p><p>Low-voltage wiring</p><p>Control integration</p><p>System programming and commissioning</p><p>E. FRESH AIR INTAKE SYSTEM</p><p>Install dedicated fresh air intake:</p><p>Routed to exterior</p><p>Properly sealed and protected</p><p>Designed to prevent gas infiltration</p><p>F. STRUCTURAL &amp; INSTALLATION COMPONENTS</p><p>Equipment mounting and installation including:</p><p>Bracketing</p><p>Anchoring systems</p><p>Vibration isolation</p><p>Perform masonry penetrations as required</p><p>Seal and reinforce all penetrations per code</p><p>G. ROOF &amp; DEMOLITION WORK</p><p>Remove (2) existing RTU units</p><p>Close and seal existing roof curb openings:</p><p>Weatherproofing</p><p>Structural integrity restoration</p><p>H. STARTUP &amp; COMMISSIONING</p><p>Complete full system startup and testing</p><p>Verify:</p><p>Cooling performance</p><p>Electrical operation</p><p>Control functionality</p><p>Provide commissioning documentation</p><p>3. ENVIRONMENTAL &amp; SAFETY REQUIREMENTS</p><p>This project is located in a classified hazardous wastewater environment, including drywell and wet well areas.</p><p>A. HAZARDOUS LOCATION REQUIREMENTS</p><p>All equipment and electrical components must meet:</p><p>Explosion-proof standards</p><p>NEMA-rated enclosures for hazardous gases</p><p>Contractor must verify classification requirements before installation</p><p>B. OSHA COMPLIANCE</p><p>Confined space entry procedures required</p><p>Continuous gas monitoring (H₂S, LEL, O₂, CO)</p><p>Lockout/Tagout (LOTO) required</p><p>PPE for hazardous atmospheres mandatory</p><p>C. IDEM REQUIREMENTS</p><p>All work within drywell and wet well environments must comply with:</p><p>Indiana Department of Environmental Management (IDEM) standards</p><p>Contractor must ensure:</p><p>No contamination of wastewater systems</p><p>Proper handling of condensate and drainage</p><p>Protection of process integrity</p><p>4. CONTRACTOR RESPONSIBILITIES</p><p>Provide all labor, supervision, tools, and incidental materials</p><p>Coordinate with Gary Sanitary District personnel</p><p>Maintain site safety and compliance at all times</p><p>Protect all existing infrastructure and systems</p><p>Remove debris and maintain clean worksite</p><p>5. SPECIAL CONSIDERATIONS (CRITICAL)</p><p>This is a high-gas, volatile environment&mdash;failure to use proper rated equipment will result in rejection</p><p>System must be designed to prevent ignition sources</p><p>Downtime and disruption to operations must be minimized</p><p>All penetrations and installations must maintain gas-tight integrity</p><p>6. DELIVERABLES</p><p>Fully installed and operational HVAC system</p><p>Electrical and control system integration</p><p>Startup and commissioning report</p><p>As-built documentation (if required)</p>",
  "isPaused": false,
  "template": {
    "title": "Request for Quotes (Final)"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2026-03-20T11:30:36.447Z",
  "department": {
    "id": 12656,
    "name": "Engineering"
  },
  "government": {
    "code": "garysan",
    "organization": {
      "city": "Gary",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/e907f300-2a8e-4a0e-bb33-31cc40d4d27a_Gary_Logo.png",
      "name": "Gary Sanitary District",
      "phone": "(219)944-0595",
      "state": "IN",
      "website": "https://garysanitary.com/",
      "zipCode": "46406",
      "address1": "3600 West 3rd Avenue",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Chicago",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2026-RFQ-032",
  "closeOutReason": null,
  "closedSubstatus": null,
  "proposalDeadline": "2026-04-03T17:00:00.000Z",
  "releaseProjectDate": "2026-03-20T05:00:00.000Z"
}