GovBidAlerts
← My Opportunities
closed🌐 nashville2025216

Nestor Pavement Repair - Sinkhole

nashville / Facilities Maintenance

Description

The Nestor Sinkhole Repair project at 130 Nestor Street is designed to restore structural integrity and operational reliability of the facility access area affected by pavement and subgrade failure. The work will be executed in phased sectional repairs to ensure that site operations remain active throughout construction. Scope of Work Mobilization & Traffic Control: Establish staging areas and implement traffic control measures to safely direct vehicle and equipment flow during sectional closures. Sectional Demolition & Excavation: Remove damaged rigid pavement and subgrade in controlled sections. Excavation will proceed in phases to limit disruption and maintain usable access routes. Subgrade Stabilization: Install geogrid reinforcement and geotextile stabilization within each section to strengthen the base and prevent recurrence of settlement. Aggregate & Base Placement: Place and compact mineral aggregate (Type A, Grading D gravel) as structural base material for each phased area. Concrete Pavement Installation: Construct 9” Portland cement concrete pavement with dowels, welded wire mesh, and Sikaflex grout as required. Concrete will be poured and cured by section, maintaining continuous access around work zones. Drainage & Utility Adjustments: Adjust manhole lids and related drainage structures as sectional pavement is restored, ensuring alignment and function. Erosion Control & Surface Treatments: Apply erosion control measures during excavation and backfill. Final work includes painted pavement markings, ensuring a safe and functional surface. Operational Considerations Phasing will allow one section to remain under repair while adjacent sections remain open for site operations. This approach minimizes downtime, maintains facility access, and ensures safe circulation for transit vehicles and personnel.

Details

Posted
Dec 4, 2025
Response deadline
Jan 13, 2026, 7:00 PM UTC
Status
closed
Buyer
nashville
Department
Facilities Maintenance
Jurisdiction
nashville
Reference #
2025216
Summary
<p data-end="507" data-start="175">The Nestor Sinkhole Repair project at <strong data-end="234" data-start="213">130 Nestor Street</strong> is designed to restore structural integrity and operational
Is Paused
false
Template Title
Construction Invitation to Bid
Copy Count
0
Government Organization Name
WeGo Public Transit
Government Organization State
TN
Government Organization Website
http://www.nashvillemta.org
Government Organization Zip Code
37155
Government Organization Address1
430 Myatt Drive
Government Organization Timezone
America/Chicago
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(615)862-5950
Finding similar opportunities…

This listing is a summary from nashville's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 213592,
  "_slug": "nashville",
  "title": "Nestor Pavement Repair - Sinkhole",
  "status": "closed",
  "summary": "<p data-end=\"507\" data-start=\"175\">The Nestor Sinkhole Repair project at <strong data-end=\"234\" data-start=\"213\">130 Nestor Street</strong> is designed to restore structural integrity and operational reliability of the facility access area affected by pavement and subgrade failure. The work will be executed in <strong data-end=\"435\" data-start=\"407\">phased sectional repairs</strong> to ensure that site operations remain active throughout construction.</p><p data-end=\"528\" data-start=\"509\"><strong data-end=\"526\" data-start=\"509\">Scope of Work</strong></p><ul data-end=\"1823\" data-start=\"529\"><li data-end=\"702\" data-start=\"529\"><p data-end=\"702\" data-start=\"531\"><strong data-end=\"566\" data-start=\"531\">Mobilization &amp; Traffic Control:</strong> Establish staging areas and implement traffic control measures to safely direct vehicle and equipment flow during sectional closures.</p></li><li data-end=\"901\" data-start=\"703\"><p data-end=\"901\" data-start=\"705\"><strong data-end=\"743\" data-start=\"705\">Sectional Demolition &amp; Excavation:</strong> Remove damaged rigid pavement and subgrade in controlled sections. Excavation will proceed in phases to limit disruption and maintain usable access routes.</p></li><li data-end=\"1073\" data-start=\"902\"><p data-end=\"1073\" data-start=\"904\"><strong data-end=\"931\" data-start=\"904\">Subgrade Stabilization:</strong> Install geogrid reinforcement and geotextile stabilization within each section to strengthen the base and prevent recurrence of settlement.</p></li><li data-end=\"1222\" data-start=\"1074\"><p data-end=\"1222\" data-start=\"1076\"><strong data-end=\"1107\" data-start=\"1076\">Aggregate &amp; Base Placement:</strong> Place and compact mineral aggregate (Type A, Grading D gravel) as structural base material for each phased area.</p></li><li data-end=\"1467\" data-start=\"1223\"><p data-end=\"1467\" data-start=\"1225\"><strong data-end=\"1260\" data-start=\"1225\">Concrete Pavement Installation:</strong> Construct 9&rdquo; Portland cement concrete pavement with dowels, welded wire mesh, and Sikaflex grout as required. Concrete will be poured and cured by section, maintaining continuous access around work zones.</p></li><li data-end=\"1627\" data-start=\"1468\"><p data-end=\"1627\" data-start=\"1470\"><strong data-end=\"1505\" data-start=\"1470\">Drainage &amp; Utility Adjustments:</strong> Adjust manhole lids and related drainage structures as sectional pavement is restored, ensuring alignment and function.</p></li><li data-end=\"1823\" data-start=\"1628\"><p data-end=\"1823\" data-start=\"1630\"><strong data-end=\"1671\" data-start=\"1630\">Erosion Control &amp; Surface Treatments:</strong> Apply erosion control measures during excavation and backfill. Final work includes painted pavement markings, ensuring a safe and functional surface.</p></li></ul><p data-end=\"2096\" data-start=\"1825\"><strong data-end=\"1855\" data-start=\"1825\">Operational Considerations</strong><br data-end=\"1858\" data-start=\"1855\">Phasing will allow one section to remain under repair while adjacent sections remain open for site operations. This approach minimizes downtime, maintains facility access, and ensures safe circulation for transit vehicles and personnel.<button></button></p>",
  "isPaused": false,
  "template": {
    "title": "Construction Invitation to Bid"
  },
  "addendums": [
    {
      "id": 98623
    },
    {
      "id": 98624
    },
    {
      "id": 98630
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2025-11-05T16:36:23.487Z",
  "department": {
    "id": 11957,
    "name": "Facilities Maintenance"
  },
  "government": {
    "code": "nashville",
    "organization": {
      "city": "Nashville",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/f2a0f256-0a33-4f79-a4a8-5f7ca797bef9_WeGo_Logo.png",
      "name": "WeGo Public Transit",
      "phone": "(615)862-5950",
      "state": "TN",
      "website": "http://www.nashvillemta.org",
      "zipCode": "37155",
      "address1": "430 Myatt Drive",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Chicago",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2025216",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2026-01-13T19:00:47.408Z",
  "releaseProjectDate": "2025-12-04T20:37:19.390Z"
}