GovBidAlerts
← My Opportunities
open🌐 RFPMart: USA (all categories)http://www.rfpmart.com/1147477-us-fed-j045--boiler-repair-hudson-valley-vahcs---montrose-campus.html

US-FED-00000387302 - J045--BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS - Deadline August 7,2026

Description

Provide the services of a mechanical contractor to replace in kind one (1) existing Webster burner assembly on Boiler #2 in the Boiler Plant (Building 20) at the VA Hudson Valley Healthcare System Montrose Campus. The Scope of Work also includes the replacement of the existing burner train field devices for both gas and oil and the replacement of existing field devices in the front of the boiler. All replacement of the field devices must be in kind. Replace burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Other repairs required are listed below. All work shall be performed in accordance with attached VA specifications, VA Design Manual, and VA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition. Background: Boiler # 2 is a Victory Energy, D–type Water–tube boiler rated at 30,000 lb/hr steam (approximately 37.5MMBtu/h input). The boiler was originally installed in 2011 with a Webster model HDSXC–105C–9V–750 Burner. The Micro–Mod Parallel Positioning (Metering) Combustion Controls were installed in a separate project, in 2019. The burner is equipped for Natural Gas Firing, as well as Number 2 Fuel Oil with the option for either compressed air or steam atomization. The back–up (Propane) pilot system is via a small (portable) bottle, connected by a temporary hose– when needed. The Burner Flame Safeguard system is a Fireye YB110, with a Fireye YZ300 Expanded Annunciation Module and a Fireye 45UV5 Scanner– all original to the 2011 project. Item #1 Replace Boiler #2 Burner Assembly and Controls – The existing Webster Burner for Boiler #2 is damaged from a fire side explosion and shall be replaced in kind as listed as the same model identified in the above background (Webster model HDSXC–105C–9V–750 Burner). All existing burner fuel train field devices (for both gas and fuel oil) located downstream of their associated isolation valve shall be replaced in kind. All burner atomization field devices located downstream of associated isolation valve shall also be replaced in kind. Replace the burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Replace all existing field devices for combustion air in kind (See Attachment D – List of field devices to be replaced). All existing field devices being replaced shall be handed over to the VA for spare parts. The existing MICROMOD and Fireye controls systems shall remain. a.) The contractor shall inspect the existing burner, field devices, and control systems serving Boiler #2 including all wiring and integrations points. Document current operational parameters and deficiencies. The VA shall provide the contractor with the as–built wiring diagrams of the existing MICRO MOD Burner Management System. Contractor shall field verify information from as–built documentation in the field and notify the VA COR of any discrepancies. b.) Provide submittals of all equipment, field devices, and materials to be installed under contract for VA review and approval. c.) Delivery Upon approval of submittals, Contractor shall order and then deliver the replacement equipment and material to site. d.) Removal – Once the replacement burner is delivered to site, the contractor shall safely disconnect and remove the existing burner, field devices, associated wiring, and fuel connections. Contractor shall hand over existing equipment and field devices to VA who will use equipment for spare parts. e.) Installation and Integration Contractor shall set the replacement burner and field devices in place and make all necessary connections to the existing Victory boiler and existing MicroMod system as well as all electrical and utility connections. Make connections to fuel supply, electrical systems, and control panels. Integrate new controls with existing boiler hardware. f.) Start Up – Contractor shall start up replacement burner. g.) Testing & Commissioning a. Once boiler is refilled, Contractor shall perform a hydrostatic test to ensure that there are no potential tube leaks on Boiler 2. b. Contractor shall calibrate all gauges and transmitters and test for proper operation on Boiler #2. Submit all test reports to VA COR c. Perform operational tests, combustion analysis, and adjustment to ensure optimal performance. Submit a completed Combustion Test Report showing the results from the combustion test. Use the attached Combustion Test Report, Attachment C. d. For controls, program control logic for optimal efficiency and safety. Conduct functional and safety tests, including failover and alarms systems. Submit all test reports to VA COR e. Contractor shall test all safety devices and tune the combustion on Boiler 2 using the testing methods specified in the VHA Boiler and Associated Safety Device Testing Manual, Eighth Edition (See Attachment A). Submit the completed test reports from the Safety Device Testing Manual to the VA COR. h.) Training Provide basic operational and maintenance training to VA staff i.) D

Details

Posted
Jul 22, 2026
Response deadline
Aug 7, 2026, 11:59 PM UTC (16d)
Status
open
Jurisdiction
RFPMart: USA (all categories)
Item
US-FED-00000387302 - J045--BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS - Deadline August 7,2026 Provide the services of a mechanical contractor to replace in
Finding similar opportunities…

This listing is a summary from RFPMart: USA (all categories)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.