OpenLocal
San Lorenzo River Lagoon Culvert Debris Boom
City of Santa Cruz · Public Works
Due Closes in 61 daysRef. IFB No. DPW-0337
At a glance
- What
The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure.
- Where
- City of Santa Cruz
- Key dates
- Posted: Nov 18, 2026
- Deadline: Tue, Jan 19, 2027 · 5:00 PM EST (closes in 61 days)
- How to respond
Submit through OpenGov ↗ · how to bid
- Documents
- 2 documents ↓
Description
The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a flood control culvert was constructed to reduce uncontrolled breaches and improve water quality for endangered fisheries. The project installed a dual-pipe drainage system designed to convey river water through the seasonal sandbar and discharge it to the ocean. This system reduces the need for mechanical breaching of the lagoon while improving water quality by removing high-salinity water from the lowest portion of the lagoon.
Read more ↓Show less ↑
By reducing the frequency of mechanical breaching, the project has proven to provide multiple benefits, including protection of public and private property, enhanced habitat conditions for endangered species such as tidewater goby and steelhead, and increased safety for recreational beach users. After the culvert became operational, an issue was identified with the specialized intake structures. These intakes are designed to allow continuous flow into the culvert while preventing fish from being harmed or impinged. However, because the screens have a fine mesh size, debris such as grass, small sticks, and trash can accumulate on the screens and reduce flow capacity. To address this issue, the City has designed a seasonal floating debris boom (Project) that will be installed around the intakes. The boom will intercept floating debris before it reaches the screens, helping keep the intake structures clear and ensuring the culvert system operates at full capacity during the summer months.
Documents (2)
All notice detailsShow ↓
- Posted
- Nov 18, 2026
- Status
- open
- Department
- Public Works
- Jurisdiction
- City of Santa Cruz
- Reference #
- IFB No. DPW-0337
- Summary
- The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a f
- Government Code
- santacruzca
- Government Organization City
- Santa Cruz
- Government Organization State
- CA
- Government Organization Website
- https://www.cityofsantacruz.com/
- Government Organization Zip Code
- 95060
- Government Organization Address1
- 809 Center st
- Government Organization Country Code
- US
- Is Paused
- No
- Template Title
- Notification for Hardcopy Submittals (IFB)
- Copy Count
- 0
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/5305cb49-90b1-4fac-9268-870e8d76c14e_Santa_Cruz_
- Government Organization Timezone
- America/Los_Angeles
- Government Organization Phone Country
- 1
This listing is a summary from City of Santa Cruz's open procurement data. The full solicitation documents are on the source portal.
Closes in 61 days🔔 Get alerts for bids like this