closed🌐 City of South Daytona, FL26-ITB-005
Melodie Park Pond Dock / Decking Construction Project
City of South Daytona, FL / Finance
Description
The City of South Daytona, FL is soliciting bids for Project Title . Sealed paper bids will be accepted in the City Manager’s Office, City Hall, located at 1672 S. Ridgewood Avenue, South Daytona, Florida 32119. Bids may be submitted electronically via the City's e-Procurement Portal at https://procurement.opengov.com/portal/southdaytona . Bids will be accepted until Response Submission Time on Response Submission Date . Project work scope: The Contractor shall provide a complete, turn-key project for the design, permitting, fabrication, delivery, and installation of a deck / dock system surrounding the newly constructed Melodie Park Pond for the City of South Daytona, in accordance with the layout depicted in the accompanying drawings. The scope shall include all labor, materials, equipment, engineering, supervision, transportation, mobilization, demobilization, and incidentals necessary to deliver a fully completed and operational deck system. The Contractor shall furnish all framing utilizing marine-grade lumber and shall install decking using WearDeck composite material (color to be determined by the City). All components shall be secured using stainless steel hardware, including bolts and torx screws for decking, blocking, and framing, to fully eliminate the potential for corrosion and ensure long-term structural integrity. The Contractor shall be responsible for providing engineered detail drawings sufficient for permitting and construction, including all structural details and site-specific adaptations. The Contractor shall obtain and include in their bid all applicable local, state, and regulatory permits and associated fees necessary to complete the work. All work must be self-performed by an active Florida State Certified Marine Contractor. Contractors are strongly encouraged to visit the project site prior to submitting a proposal to verify existing conditions, including site dimensions, configuration, access constraints, and any other factors that may impact construction. The Contractor shall be responsible for site preparation, protection of existing improvements, and maintaining a safe work environment throughout the project duration. Upon completion, the Contractor shall perform all post-construction cleanup, removal of debris, and restoration of disturbed areas to pre-construction or better condition. The Contractor shall provide a minimum one (1) year warranty on workmanship and shall pass through all applicable manufacturer warranties for materials utilized in the project. The submitted bid price shall represent a complete lump sum, inclusive of all costs, including but not limited to design, engineering, permitting, materials, fabrication, shipping, installation, labor, equipment, cleanup, and any other expenses incurred to deliver the finished project to the City of South Daytona.
Details?
- Posted
- Apr 15, 2026
- Response deadline
- May 27, 2026, 7:00 PM UTC
- Status
- closed
- Buyer
- City of South Daytona, FL
- Department
- Finance
- Jurisdiction
- City of South Daytona, FL
- Reference #
- 26-ITB-005
- Has Description
- true
- Summary
- The City of South Daytona, FL is soliciting bids for <svg class="codeIcon" xmlns="http://www.w3.org/2000/svg" width="1
- Government Code
- southdaytona
- Government Organization City
- South Daytona
- Government Organization State
- FL
- Government Organization Website
- https://www.southdaytona.org/
- Government Organization Zip Code
- 32119
- Government Organization Address1
- 1672 S Ridgewood Ave
- Government Organization Country Code
- US
- Closed Substatus
- awarded
Contact
(386)322-3064
Finding similar opportunities…
This listing is a summary from City of South Daytona, FL's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.