IFBopen🌐 Virginia (eVA)123451
ITB No. 26-2970-5JL - Fall Line Trail Southern Sections
Henrico County Government
Description
The Work consists of the following: Lakeside Community Trail Phase 2 #FLTThe Lakeside Community Trail Phase 2 proposed improvements total approximately 2,300 linear feet of shared-use-path including a branch connection from the primary trail to Brook Run Drive, pedestrian crosswalks at the intersection of Dumbarton Road and Gillespie Avenue, and two crossings over Upham Brook. A combination of approximately 150 linear feet of premanufactured truss and 380 linear feet of concrete boardwalk structures will be used to cross Upham Brook near Dumbarton Road and on the approach to the Belmont Park baseball fields. The improvements also consist of drainage design, stormwater management (SWM), pavement marking, and signing. Lakeside Community Trail Phase 3 #FLTThe Lakeside Community Trail Phase 3 proposed improvements total approximately 3,500 linear feet of shared-use-path including a crossing over Upham Brook. A combination of approximately 100 linear feet of premanufactured truss and 490 linear feet of concrete boardwalk structures will be used to cross Upham Brook near the Grand Richmond at Brook Run on the approach to Hilliard Road. The improvements also consist of drainage design, stormwater management (SWM), pavement marking, and signing.Brook Road and Hilliard Road Trail #FLTThe Brook Road and Hilliard Road Trail proposed improvements total approximately 2,800 linear feet of shared-use path, including a pedestrian crosswalk across Hilliard Road (Route 161) and a proposed pedestrian crossing over North Run. A combination of approximately 60 linear feet of premanufactured truss and 30 linear feet of concrete boardwalk structures will be used to cross North Run adjacent to the Belmont Golf Course parcel near the intersection of Hilliard Road (Route 161) and Brook Road (Route 1). The Brook Road and Hilliard Road Trail improvements also include a portion of the road diet along Hilliard Road (Route 161) from four lanes to three lanes. The improvements also consist of drainage design, utility design, stormwater management (SWM), pavement marking, and signing.Hilliard Road Safety and Mobility ImprovementsThe Hilliard Road Safety and Mobility proposed improvements total approximately 2,700 linear feet of pavement marking and signing improvements within existing right-of-way to add bicycle lanes and accommodations. The improvements are along Hilliard Road between Lakeside Avenue and approximately 1,000 feet west of Brook Road, tying into the Brook Road and Hilliard Road Trail proposed improvements. The proposed bicycle lanes will be accompanied by a road diet from four lanes to three lanes.
Details?
- Posted
- Jun 30, 2026
- Response deadline
- Aug 13, 2026, 2:00 PM UTC (33d)
- Type
- IFB
- Category
- Construction
- Status
- open
- Buyer
- Henrico County Government
- Jurisdiction
- Virginia (eVA)
- Location
- County of Henrico, VA
- Reference #
- 123451
- App
- IV
- Agency
- LA22HENRICOGOVT
- Doctype
- SO
- Version
- 1
- Longdesc
- The Work consists of the following: Lakeside Community Trail Phase 2 #FLTThe Lakeside Community Trail Phase 2 proposed improvements total approximately 2,300 linear feet of shared-use-path including a
- Doccddesc
- Invitation for Bids (IFB)
Contact
Jianchong Luo
Finding similar opportunities…
This listing is a summary from Virginia (eVA)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.