GovBidAlerts
← My Opportunities
open🌐 City of KyleRFP-2026-075

KYLE WWTP EXPANSION PHASE 2, FULL WORKS PACKAGE

City of Kyle / Water Utilities

Description

The City of Kyle Wastewater Treatment Plant is currently undergoing construction of the Early Works Package (EWP), which will provide an additional 1.5 million gallons per day (MGD) of treatment capacity. The EWP represents the initial phase of a comprehensive plant expansion with the completion of the Full Works Package (FWP) Expansion, which will ultimately increase the facility’s treatment capacity to 9.0 MGD. The expansion includes the construction of several new treatment and support facilities, including a Grit Removal Facility, Odor Control Units, Storage Facility, and CMU Wall. The project also incorporates significant improvements and expansions to existing treatment processes and infrastructure to support the increased capacity and enhance overall plant performance. Major improvements include Headworks modifications; an Aeration Basin Splitter Box; expanded Aeration Basins and Clarifiers; upgrades to the RAS/WAS Pump Station; Rapid Mix and Flocculation improvements; UV Disinfection upgrades; Post-Aeration Basins; Effluent Flow Metering; and improvements to the Aerobic Digesters and Blowers. The project also includes enhancements to the plant-wide SCADA monitoring and control system to improve operational visibility, automation, and process management. Additionally, improvements to the existing Package Plants will be incorporated as part of the overall expansion. Collectively, these improvements will provide the City of Kyle with increased wastewater treatment capacity, improved process reliability, enhanced operational efficiency, and the infrastructure necessary to accommodate continued community growth.

Documents (4)

  • 📎 6ac3ec6f-3983-49ff-bbcf-88f37e0ed246_Kyle_WWTP_Expansion_FWP_-_Bid_Set_-_Drawings_(Volume_2_of_3).pdf
    application/pdf · 176.9 MB
    Download
    File is too large (177MB) — download to view.
  • 📎 816655d5-37c6-436a-a022-43baf18cb9b4_Kyle_WWTP_Expansion_FWP_-_Bid_Set_-_Drawings_(Volume_3_of_3).pdf
    application/pdf · 163.9 MB
    Download
    File is too large (164MB) — download to view.
  • 📎 89cd8fc3-188a-4cd5-a042-779452f9f51e_Kyle_WWTP_Expansion_FWP_-_Bid_Set_-_Drawings_(Volume_1_of_3).pdf
    application/pdf · 335.4 MB
    Download
    File is too large (335MB) — download to view.
  • 📎 a1efdc6a-0912-41ea-8cbb-947d4a77ff4d_Kyle_WWTP_Expansion_FWP_-_Project_Manual.pdf
    application/pdf · 50.2 MB
    Download
    File is too large (50MB) — download to view.

Details

Posted
Aug 31, 2026
Response deadline
Oct 15, 2026, 8:00 PM UTC (30d)
Status
open
Buyer
City of Kyle
Department
Water Utilities
Jurisdiction
City of Kyle
Reference #
RFP-2026-075
Has Description
true
Summary
The City of Kyle Wastewater Treatment Plant is currently undergoing construction of the Early Works Package (EWP), which will provide an additional 1.5 million gallons per day (MGD) of treatment ca
Government Code
cityofkyle
Government Organization City
Kyle
Government Organization State
TX
Government Organization Website
http://www.cityofkyle.com/
Government Organization Zip Code
78640
Government Organization Address1
100 W. Center Street
Government Organization Country Code
US
Other
Is Paused: false · Template Title: Request for Proposal · Copy Count: 0 · Government Organization Logo: https://assets.procurement.opengov.com/logo-uploads/91c3df4a-29d5-44ab-b689-876c6f813c3f_logo.png · Government Organization Timezone: America/Chicago · Government Organization Phone Country: 1

Contact

(512)262-3924

Similar open opportunities

See opportunities like this one

GovBidAlerts matches this solicitation to similar open bids across 120,000+ open bids from 2,400+ sources. Create a free account to unlock them.

Create free accountno credit card required

This listing is a summary from City of Kyle's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.