GovBidAlerts
← My Opportunities
Construction Solicitationopen🌐 King County, WAKC001738,1

Cedar Hills Regional Landfill Pilot-Scale Micro-Electrolysis

King County

All open bids & awards from King County β†’

Description

The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The pilot-scale ME technology and treatment system has been selected to pretreat the industrial wastewater stream from the methane processing plant prior to the stream entering the leachate lagoon pretreatment system. The experimental ME technology was developed by the University of Washington (UW) and designed at current scale by WSP USA (WSP). CHRLF discharges industrial wastewater collected at the landfill to the King County publicly owned treatment works (POTW) in Renton, Washington, under Waste Discharge Permit No. 7842-04 (discharge permit), issued to the County by the King County Industrial Waste (KCIW) program. The Work includes but is not limited to the following features: 1. Obtain all permits necessary to perform the Work. 2. Furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring. 3. Furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation. 4. Furnish initial bulk chemicals and media. 5. Installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations. 6. Hydrostatic and leak testing. 7. Pre-commissioning, commissioning, inspections, and final system testing.

Details

Posted
Oct 9, 2026
Response deadline
Oct 27, 2026, 8:30 PM UTC (17d)
Type
Construction Solicitation
Status
open
Buyer
King County
Jurisdiction
King County, WA
Reference #
KC001738,1
Has Description
true
Synopsis
The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF.
Time Remaining
17 Days 10 Hours
Attachments Count
2
Negotiation Status
Active
Time Remaining Order
17.430868055555557
Amendment Description
Addendum 1 has been issued. Suppliers must acknowledge all addenda before submitting a response. If a supplier has already submitted a response, they MUST log into the E-Procurement Supplier Portal, a

Contact

Annette Hansford
ahansford@kingcounty.gov

Similar open opportunities

See opportunities like this one

GovBidAlerts matches this solicitation to similar open bids across 118,000+ open bids from 2,500+ sources. Create a free account to unlock them.

Create free accountno credit card required

This listing is a summary from King County, WA's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.