BidAtlas
← My Opportunities
closed🌐 pinellasfl24-0409-ITB-C STEP 2

Manufactured Home Communities(MHC's) Wastewater System Improvements Project Package 1 (PID 005015A) ARPA STEP 2

pinellasfl / UTILITIES

Description

The purpose of this project is to provide upgrades to outdated and problematic wastewater systems within fourteen (14) manufactured home communities (MHCs). Specifically within Package 1, work includes decommissioning, replacement, and construction of the existing wastewater collection system, namely Boca Ciega Residents’ Association, Inc. Additionally, there are three (3) additives which are labeled as optional work that is conditional based on availability of additional grant funds is the decommissioning, replacement, and construction of three (3) MHC’s wastewater collection system, namely Robert F. Gallagher Revocable Trust (also known as Florida Mobile Home Park (MHP)), Holiday Shores Park, Inc, and Pointe West Resident Owned Community (ROC), Inc. The construction of this project is funded by the United States (U.S.) Department of the Treasury Award SLFRP4653 and the Florida Department of Environmental Protection’s (FDEP) Resilient Florida Grant No. 22FRP09; therefore substantial completion has a deadline of June 30, 2026. Project benefits include, but are not limited to, mitigating the adverse impacts from wetter climate conditions, flooding, and sea level rise by improving critical wastewater infrastructure to reduce sanitary sewer overflows. Overall replacement of the wastewater collection systems within these communities would eliminate leaking pipes, leaking manholes, and illegal connections from storm and roof drains. This would result in a contribution to higher water quality in the area and nearby water bodies, a contribution to the protection of living coastal and marine resources and their environments, and a more resilient wastewater collection system in an environmentally vulnerable area.

Details

Posted
May 8, 2024
Response deadline
Jun 20, 2024, 7:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
UTILITIES
Jurisdiction
pinellasfl
Reference #
24-0409-ITB-C STEP 2
Summary
<p>The purpose of this project is to provide upgrades to outdated and problematic wastewater systems within fourteen (14) manufactured home communities (MHCs). Specifically within Package 1, work incl
Is Paused
false
Template Title
Construction - ITB V2
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 94585,
  "_slug": "pinellasfl",
  "title": "Manufactured Home Communities(MHC's) Wastewater System Improvements Project Package 1 (PID 005015A) ARPA STEP 2",
  "status": "closed",
  "summary": "<p>The purpose of this project is to provide upgrades to outdated and problematic wastewater systems within fourteen (14) manufactured home communities (MHCs). Specifically within Package 1, work includes decommissioning, replacement, and construction of the existing wastewater collection system, namely Boca Ciega Residents&rsquo; Association, Inc. Additionally, there are three (3) additives which are labeled as optional work that is conditional based on availability of additional grant funds is the decommissioning, replacement, and construction of three (3) MHC&rsquo;s wastewater collection system, namely Robert F. Gallagher Revocable Trust (also known as Florida Mobile Home Park (MHP)), Holiday Shores Park, Inc, and Pointe West Resident Owned Community (ROC), Inc. The construction of this project is funded by the United States (U.S.) Department of the Treasury Award SLFRP4653 and the Florida Department of Environmental Protection&rsquo;s (FDEP) Resilient Florida Grant No. 22FRP09; therefore substantial completion has a deadline of June 30, 2026.</p><p>Project benefits include, but are not limited to, mitigating the adverse impacts from wetter climate conditions, flooding, and sea level rise by improving critical wastewater infrastructure to reduce sanitary sewer overflows. Overall replacement of the wastewater collection systems within these communities would eliminate leaking pipes, leaking manholes, and illegal connections from storm and roof drains. This would result in a contribution to higher water quality in the area and nearby water bodies, a contribution to the protection of living coastal and marine resources and their environments, and a more resilient wastewater collection system in an environmentally vulnerable area.</p>",
  "isPaused": false,
  "template": {
    "title": "Construction - ITB V2"
  },
  "addendums": [
    {
      "id": 39795
    },
    {
      "id": 40628
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2024-05-07T19:48:46.994Z",
  "department": {
    "id": 2540,
    "name": "UTILITIES"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "24-0409-ITB-C STEP 2",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2024-06-20T19:00:00.000Z",
  "releaseProjectDate": "2024-05-08T15:06:04.479Z"
}