GovBidAlerts
← All opportunities

6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV

Key dates

Posted
Jul 16, 2026
Response deadline
Aug 14, 2026, 7:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Presolicitation
Set-aside
Set-aside code
PSC
6150

NAICS

Issuing office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
261-NETWORK CONTRACT OFFICE 21 (36C261)
Office code
036.3600.36C261
Organization type
OFFICE
Office address
MATHER, CA, 95655, USA

Place of performance

Street
Street 2
City
State
Zip
Country

Contacts

Description

Title: NRM 654-26-020 - Building 12 Pump Power Relocation Description: The Department of Veterans Affairs, Network Contracting Office (NCO) 21, has a requirement for a contractor to provide all personnel, equipment, tools, materials, and supervision necessary to relocate and add additional power legs to the water pumps in the Building 12 basement. Scope of Work: The Contractor shall install emergency power, relocate the normal power onto the existing motor control center (MCC), and install a new manual transfer switch (MTS) to correct existing system deficiencies where pumps currently have no emergency power source. The Contractor must conduct a thorough review of the work area and existing equipment to identify potential pathways and determine the most feasible course of action for installation. Key Requirements: Compliance & Safety: The new normal and emergency electrical systems must be fully compliant with the VA Technical Information Library (TIL), the Veterans Health Administration (VHA) Electrical Design Manual, and all up-to-date safety codes. The contractor must also strictly follow OSHA safety and Lock-Out-Tag-Out (LOTO) procedures. Working Hours & Outages: Standard work hours shall be Monday through Friday, 0700 to 1700, excluding federal holidays. The contractor must give the Contracting Officer's Representative (COR) advanced notice before executing any facility outages. Schedule & Milestones: The contractor must submit a schedule detailing materials, labor, and construction milestones within the first two weeks of the project start date. The entire project must be completed within 180 calendar days after the issuance of the Notice to Proceed (NTP). Certifications: The General Contractor s Competent Person/Superintendent must hold a 30-hour OSHA construction safety certification, and all on-site employees (including subcontractors) must hold a 10-hour OSHA certification. Insurance & Warranty: The contractor must submit documentation from their insurance carrier verifying an Experience Modification Rate (EMR) equal to or less than 1.0. A standard one-year warranty on all materials and workmanship is required. Place of Performance: Services are required at the following location: VA Sierra Nevada Health Care System, 975 Kirman Avenue, Reno, NV 89502-2597. Contract Type: Firm-Fixed-Price Construction Contract, 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

Attachments (12)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
fef33bacd2e444cbbc6d2b96baf3519e
Full path
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.261-NETWORK CONTRACT OFFICE 21 (36C261)
Office code
036.3600.36C261
Ingested
Jul 17, 2026
Updated
Jul 17, 2026