GovBidAlerts
← All opportunities

W912DY26RA063

Key dates

Posted
Apr 28, 2026
Response deadline
May 7, 2026, 3:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Women-Owned Small Business
Set-aside code
WOSB
PSC
P400

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2V6 USA ENG SPT CTR HUNTSVIL
Office code
021.2100.USACE.SCO ALX.HNC.W912DY
Organization type
OFFICE
Office address
REDSTONE ARSENAL, AL, 35898-0000, USA

Place of performance

Street
Twentynine Palms, California
Street 2
City
State
Zip
92277
Country

Contacts

Description

The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.

Similar open contracts

Metadata

Notice ID
fec068aae82049ac9ed2b2fe33085efe
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W2V6 USA ENG SPT CTR HUNTSVIL
Office code
021.2100.USACE.SCO ALX.HNC.W912DY
Ingested
May 1, 2026
Updated
Jul 11, 2026