This notice has been superseded. See the latest notice: REPAIR CRACKS AND SPALLS, B43421 (Solicitation)
SolicitationActiveFA527025R0017
REPAIR CRACKS AND SPALLS, B43421
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA5270 18 CONS PKKey dates?
- Posted?
- Jul 9, 2025
- Response deadline?
- Jul 21, 2025, 5:00 AM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- Z2JZ
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE AIR FORCE
- Office?
- FA5270 18 CONS PK
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- APO, AP, 96368-5199, USA
Place of performance?
- Street?
- Kadena Air Base, Okinawa Japan
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- 96368
- Country?
- —
Contacts?
- Christopher Nicolasprimary
- Emily Rubinosecondary
Description?
Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
Other notices in this solicitation?
- SolicitationREPAIR CRACKS AND SPALLS, B43421Aug 4, 2025LATEST
- SolicitationREPAIR CRACKS AND SPALLS, B43421Jul 11, 2025
- SolicitationREPAIR CRACKS AND SPALLS, B43421Jun 18, 2025
Similar open contracts
Metadata?
- Notice ID?
- f627d9c77d0b421488540fccc8b2a2e0
- Full path?
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA5270 18 CONS PK
- Office code?
- —
- Ingested?
- May 2, 2026
- Updated?
- Jul 11, 2026