SolicitationActive36C24226R0034
Y1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 242-NETWORK CONTRACT OFFICE 02 (36C242)Key dates?
- Posted?
- Apr 30, 2026
- Response deadline?
- May 13, 2026, 7:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Service-Disabled Veteran-Owned Small Business Set Aside
- Set-aside code?
- SDVOSBC
- PSC?
- Y1DZ
NAICS?
Issuing office?
- Department?
- VETERANS AFFAIRS, DEPARTMENT OF
- Sub-tier?
- VETERANS AFFAIRS, DEPARTMENT OF
- Office?
- 242-NETWORK CONTRACT OFFICE 02 (36C242)
- Office code?
- 036.3600.36C242
- Organization type?
- OFFICE
- Office address?
- ALBANY, NY, 12208, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- New York
- State?
- New York
- Zip?
- 10010
- Country?
- UNITED STATES
Contacts?
- Kim GomezprimaryContract Specialist
- Les Griffithsecondary
Description?
The purpose of Amendment 0004 is to submit responses to RFI's. Response date remains, May 6 ,2026 3pm EST The deadline for submitting RFI's is April 29, 2026. RFI's received after this date will not be considered. Please see the attached. This project is a design-build to upgrade the AC Plants to include three new chillers and associated cooling towers which generate additional heat than previous equipment. New equipment is controlled by variable frequency drive cabinets that also generate substantial heat and need to be cooled. Existing ventilation is not sufficient, and new equipment began to shut down during peak summer loads. Electrical switchgear is needed to provide minimum cooling to Main Hospital for patient care. Re-uploaded attachments to make them viewable to the public. The purpose of Amendment 0002 is to provide responses to RFIs received. The response date is changed from April 4, 2026 to May 1, 2026 at 12:00PM Eastern time. Please see attachement 36C24226R0034 0002 for additional details. The purpose of Amendment 0003 is to provide responses to RFIs, to provide drawings files, and to provide site visit details. The response date is changed to May 6, 2026 at 3:00PM Eastern time. Please see attachment 36C24226R0034 0003 for additional details. The purpose of Amendment 0005 is to provide responses to RFIs and to extend the response date to 3:00PM on May 13, 2026. Please see attachment 36C24226R0034 0005 for additonal details.
Attachments (27)?
- Download📎 01+35+26+Safety+Requirements+Design+Build+HVAC+Bldgs.+4+and+5.1.docxapplication/octet-stream · 77 KB
- Download📎 S02+AUTODESK+Contractors+Access+Instructions+1.1.pdfapplication/pdf · 1.1 MB
- Download📎 36C24226R0034_1.1.docxapplication/octet-stream · 323 KB
- Download📎 S02+SAFETY+AND+ENVIRONMENTAL+RECORD+2.1.docxapplication/octet-stream · 16 KB
- Download📎 SCA+Wagw+No+2015+4187+Rev+34+12032025.1.pdfapplication/pdf · 4.6 MB
- Download📎 S02+52.225-2+BUY+AMERICAN+CERTIFICATE+2.1.docxapplication/octet-stream · 16 KB
- Download📎 S02+Architectural+Drawing.pdfapplication/pdf · 576 KB
- Download📎 36C24226R0034+0004.docxapplication/octet-stream · 113 KB
- Download📎 S02+INSTRUCTIONS+TO+BIDDERS+REGARDING+TAX+EXEMPTION+IN+NY+2.1.docxapplication/octet-stream · 18 KB
- Download📎 S02+LIMITATION+ON+SUBCONTRACTING+2.1.docxapplication/octet-stream · 16 KB
- Download📎 Amendment+00004+RFI+Answers.docxapplication/octet-stream · 18 KB
- Download📎 WD+NY20250003+Mod+17+12122025.1.pdfapplication/pdf · 3.6 MB
- Download📎 36C24226R0034+0003.docxapplication/octet-stream · 114 KB
- Download📎 S02+Participation+Goals+for+Minorities+and+Females+2.1.pdfapplication/pdf · 414 KB
- Download📎 013200+Construction+Documentation+Design+Build+HVAC+Bldgs.+4+and+5.1.docxapplication/octet-stream · 21 KB
- Download📎 S02+Privacy+Training+for+Personnel+without+Access+to+VA+Computer+1.1.pdfapplication/pdf · 62 KB
- Download📎 36C24226R0034+0001.pdfapplication/pdf · 368 KB
- Download📎 S02+Mechanical+Print+Chiller+Plant+Drawing.pdfapplication/pdf · 575 KB
- Download📎 VA+Privacy+Training+Document.pdfapplication/pdf · 143 KB
- Download📎 36C24226R0034+0002.docxapplication/octet-stream · 123 KB
- Download📎 Amendment+00003+RFI+Answers.docxapplication/octet-stream · 19 KB
- Download📎 S02+Mech_CD+Drawing.pdfapplication/pdf · 3.3 MB
- Download📎 36C24226R0034+0005.docxapplication/octet-stream · 118 KB
- Download📎 S02+Elec+CD+Drawing.pdfapplication/pdf · 2.5 MB
- Download📎 01+00+00+General+Requirements+Design+Build+HVAC+Bldgs.+4+and+5.1.docxapplication/octet-stream · 101 KB
- Download📎 S02+LIQUIDATED+DAMAGES+FORMULATION+MEMO+2.1.docxapplication/octet-stream · 18 KB
- Download📎 S02+FAR+DEVIATION+FEB+2025+NOTICE+2.1.docxapplication/octet-stream · 15 KB
Other notices in this solicitation?
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Apr 29, 2026
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Apr 24, 2026
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Apr 20, 2026
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Feb 26, 2026
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Feb 3, 2026
- SolicitationY1DZ--NRM - CONSTR PROJ - 630-26-102 Design Build HVAC Bldgs. 4 and 5Feb 2, 2026
Similar open contracts
Metadata?
- Notice ID?
- f24add747a5c4247b410bc0fb843eaa1
- Full path?
- VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.242-NETWORK CONTRACT OFFICE 02 (36C242)
- Office code?
- 036.3600.36C242
- Ingested?
- May 1, 2026
- Updated?
- Jun 12, 2026