SolicitationActive140L1726R0005
BLM-CO TRFO BASIN WELL AND WATER SYSTEM
INTERIOR, DEPARTMENT OF THE / BUREAU OF LAND MANAGEMENT / COLORADO STATE OFFICEKey dates?
- Posted?
- Aug 28, 2026
- Response deadline?
- Sep 9, 2026, 6:00 PM UTC
- Archive date?
- Sep 24, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Indian Small Business Economic Enterprise
- Set-aside code?
- ISBEE
- PSC?
- Z2NE
NAICS?
Issuing office?
- Department?
- INTERIOR, DEPARTMENT OF THE
- Sub-tier?
- BUREAU OF LAND MANAGEMENT
- Office?
- COLORADO STATE OFFICE
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- Lakewood, CO, 80225, USA
Place of performance?
- Street?
- Latitude: 38.06529167° N Longitude: -108.63154723° W
- Street 2?
- —
- City?
- Naturita
- State?
- CO
- Zip?
- —
- Country?
- USA
Contacts?
- Strickland, Courtniprimarycstrickland@ios.doi.gov(awards)fax 0000000000
Description?
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. Socio-economic Categories: While this procurement will be solicited only to the C-MAC Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 360 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -LPTA see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov
Other notices in this solicitation?
- SolicitationZ--BLM-CO TRFO BASIN WELL AND WATER SYSTEMSep 3, 2026LATEST
- SolicitationZ--BLM-CO TRFO BASIN WELL AND WATER SYSTEMSep 2, 2026LATEST
- SolicitationZ--BLM-CO TRFO BASIN WELL AND WATER SYSTEMAug 28, 2026
Similar open contracts
Metadata?
- Notice ID?
- e6b0be7d165d4af29c632bb1b39a4247
- Full path?
- INTERIOR, DEPARTMENT OF THE.BUREAU OF LAND MANAGEMENT.COLORADO STATE OFFICE
- Office code?
- —
- Ingested?
- Sep 13, 2026
- Updated?
- Sep 13, 2026