GovBidAlerts
← All opportunities

MACH1_AOI_Military Working Dog Kennels at JBSA-LOE1

Key dates

Posted
Aug 10, 2026
Response deadline
Aug 28, 2026, 3:00 PM UTC
Archive date
Aug 29, 2260
Archive type
autocustom

Classification

Notice type
Special Notice
Base type
Special Notice
Set-aside
No Set aside used
Set-aside code
NONE
PSC

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA8903 772 ESS PK
Office code
Organization type
OFFICE
Office address
JBSA LACKLAND, TX, 78236-9861, USA

Place of performance

Street
Street 2
City
JBSA Ft Sam Houston
State
TX
Zip
Country
USA

Contacts

Description

This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a. The 772nd Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Cetner (AFCEC), is seeking an innovative commercial partner to execute this project in two distinct Lines of Effort (LOE); Design & Planning (LOE 1), Physical Construction (LOE 2) for the scope defined as follows. The Government intends to upgrade both the Joint Base San Antonio (JBSA) - Lackland West facilities and the Chapman Training Annex, beginning with the Chapman Annex. The total 341st Training Squadron requirement is to house and train 850 dogs across two sites to support the Defense Military Working Dog (MWD) Kennel Program. This AOI seeks an innovative partner to rapidly develop a comprehensive, site-specific, and constructible design package using non-traditional construction approach built on Engineered Tensile Facilities (ETF) as the baseline structure. This initial Line of Effort (LOE 1) Design & Planning: will focus exclusively on delivering a mature design and a firm, executable plan for the full construction effort.The primary goal of LOE 1 is to produce a detailed, site-specific plan that enables a rapid and predictable approach for LOE 2: Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT002_MWDK_10 Aug 26

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
e63f068f3f8a4b949e47656bb89288e4
Full path
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA8903 772 ESS PK
Office code
Ingested
Aug 25, 2026
Updated
Aug 25, 2026