This notice has been superseded. See the latest notice: Refurbish Wash Rack Floor - F129, Vance AFB, OK (Combined Synopsis/Solicitation)
Combined Synopsis/SolicitationActiveFP1020977
Refurbish Wash Rack Floor - F129, Vance AFB, OK
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA3029 71 FTW CVCKey dates?
- Posted?
- May 20, 2026
- Response deadline?
- Jun 18, 2026, 4:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- No Set aside used
- Set-aside code?
- NONE
- PSC?
- Z2JZ
NAICS?
- 238330Flooring Contractors
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE AIR FORCE
- Office?
- FA3029 71 FTW CVC
- Office code?
- 057.5700.AETC.FA3029
- Organization type?
- OFFICE
- Office address?
- ENID, OK, 73705-5037, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Enid
- State?
- Oklahoma
- Zip?
- 73705
- Country?
- UNITED STATES
Contacts?
- Betty S. Kliewerprimary
- Vance Local Purchasesecondary
Description?
Amendment #2; Quote Extention: The purpose of this amendment is to extend the required quote validity period. All offerors shall ensure their quotes remain valid for 180 days from the date and time of the solicitation closes. This extended timeframe will provide the government with the strongest opportunity to secure the necessary funding and ensure continuity in the procurement process. Amendment #1; Site Visit Details; A site visit is scheduled for May 28, 2026 at 1PM CST; attendees will need to report to the Vance Visitor Center F72 upon arrival to be sponsored on. All contractors/visitors must comply with Vance AFB access requirements, including Real ID compliant identification and adherence to installation security procedures, along with vehicle registration and current insurance. ASRC Federal Gulf State Constructors (AFGSC), as Prime Contractor to the United States Government, hereby solicits quotes from qualified firms for the following Firm-Fixed-Price requirement. This is a combined Synopsis/Solicitation for commercial items prepared in accordance with the format in FAR 12.6, and supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Important Funding Notice This requirement is currently unfunded. Award is subject to the availability of funds. All quotes must remain valid through September 30, 2026. Neither AFGSC nor the Government is obligated to award any portion of this requirement or incur any liability unless and until funding is made available. AFGSC or the Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event AFGSC or Government cancels this solicitation, neither AFGSC nor the Government has any obligation to reimburse any offeror for any costs. Description of Requirement ASRC Federal Gulf State Constructors requests Firm-Fixed-Price quotes to refurbish the wash rack floor in Facility 129 at Vance AFB, OK consistent with the detailed Statement of Work (SOW). Instructions to Offerors Offerors must submit a Firm-Fixed-Price quote using the Appendix B - Bid Form in the attached SOW. Quotes should cover all supervision, labor, materials, equipment, submittals, testing, cleanup, and incidental work required to deliver a complete and usable final product. Required Submission Components 1. Firm-Fixed-Price Quote consistent with Appendix B Bid Form. 2. Technical Submittals • Full coating system TDS & SDS • Chemical resistance data • MVB primer documentation • Proposed floor striping plan (CAD + PDF) 3. Project Schedule compatible with the 60-day POP. 4. Superintendent & Quality Control Manager Qualifications (experience requirements per SOW) 5. Safety Plan compliant with OSHA 29 CFR 1926 and DAFMAN 91-203. Email quotes to Betty Kliewer; betty.kliewer.ctr@us.af.mil no later than June 18, 2026 at 11:00 AM CST. No late entries will be considered or evaluated. All Offerors must be fully registered in Sam.gov at the time of quote submission. Quotes will be evaluated based on: LPTA (Lowest Price Technically Acceptable) A site visit will be scheduled. It will be added as a amendment to this solicitation once the date/time has been determined. All contractors/visitors must comply with Vance AFB access requirements, including Real ID compliant identification and adherence to installation security procedures, along with vehicle registration and current insurance. Question-Answers: All questions must be submitted using only the provided Q&A Form and email to betty.kliewer.ctr@ us.af.mil NLT June 15, 2026. No further questions will be accepted or answered. Responses will be issued via solicitation amendment and will be the responsibility of the Offeror to check in SAM for updates. ATTACHMENTS: Statement Of Work Wage Determination Q&A Form Vendor Information
Attachments (4)?
Other notices in this solicitation?
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKJun 18, 2026
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKJun 18, 2026LATEST
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKJun 18, 2026
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKJun 3, 2026
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKMay 15, 2026
- Combined Synopsis/SolicitationRefurbish Wash Rack Floor - F129, Vance AFB, OKMay 11, 2026
Similar open contracts
Metadata?
- Notice ID?
- d56b33cf442b418f821712861bbe2e9b
- Full path?
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA3029 71 FTW CVC
- Office code?
- 057.5700.AETC.FA3029
- Ingested?
- May 21, 2026
- Updated?
- Jul 11, 2026