GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: Over the Horizon Radar (OTHR) Infrastructure (Solicitation)

Over the Horizon Radar (OTHR) Infrastructure

Key dates

Posted
Aug 30, 2026
Response deadline
Sep 3, 2026, 4:00 PM UTC
Archive date
Aug 30, 2027
Archive type
autocustom

Classification

Notice type
Special Notice
Base type
Special Notice
Set-aside
Set-aside code
PSC
Y1BC

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W071 ENDIST KANSAS CITY
Office code
Organization type
OFFICE
Office address
KANSAS CITY, MO, 64106-2896, USA

Place of performance

Street
Multiple simultaneous locations in Oregon
Street 2
City
State
Zip
Country

Contacts

Description

****20260830 Update - Providing Draft Documents**** This program is moving untypically fast. The current plan is to issue the Request for White Papers NLT 3 September 2026 with short suspenses for providing them as well as Step 2. In acknowledgement of this, we are attached the DRAFT Solicitation document and Request for White Papers. These are DRAFT and the official ones will be issued NLT 3 September 2026. PROGRAM Notification For Construction Manager at Risk (CM@R) under Other Transaction (OT)Project: Over the Horizon Radar (OTHR) Infrastructure, Oregon. The U.S. Army Corps of Engineers (USACE) is issuing this notice to industry that this requirement will be solicited for preconstruction services and construction of the OTHR infrastructure using Construction Manager at Risk under 10 USC 2808a Other Transaction for Construction. This notice is provided for informational purposes to allow interested parties to be aware of the change in strategy. Project Overview Project Title: OTHR Infrastructure Location: Oregon Agency: USACE, Kansas City District (NWK)NAICS Code: 236220-Commerical and Industrial Building Construction Project Description. This OTHR system requires two sites, a Transmitting site and a Receiver site, located approximately 125 miles apart that are interdependent and must be executed concurrently. The sites are remotely located and positioned to monitor the United States Northwest approach corridor. Transmitting Site Requirements: Besides clearing and grading a little over 2 square miles for the antenna arrays, the following are also required:????????????????????????????????????????????????????????????????????????????????? Operations Facility, Pre-Engineered Building (PEB) on slab, 10,787 SF. Server Room, workshop, office area, restroom, comm room, break room, logistics room, mechanical room, electrical room o EMI shielding in comm room, EMI shielding for UPS (located in electrical room) o 160 SF UPS Battery Sheltero Electric, comm, water, sewer (septic system) utilities Water Treatment Building, PEB on slab, 1,323 SFo Fire water storage tank required, commercial off the shelfo Potable water storage tank required, commercial off the shelfo Connect to water well (well installed by others)o Treatment system for potable water????????????????????????????????????????????????????????????????????????????????? Vehicle Maintenance Shelter, PEB on slab, 1,600 SFo One 12?????????????????????????????????????????????????????????????????????????????????x12????????????????????????????????????????????????????????????????????????????????? garage dooro No heatingo Electric and water utilities????????????????????????????????????????????????????????????????????????????????? Vehicle Storage Shelter, PEB on slab, 2,450 SFo Electric utilities only, no heatingo Drive through Overhead Doorso Workbench areas????????????????????????????????????????????????????????????????????????????????? Power Areao Gravel area with all equipment and fuel storage on concrete padso Houses transformers, backup generator system (2 generators, government furnished), 14.4KV load bank (government furnished), 80,000 gal generator fuel storage (double walled), switchgear integrated with SCDA, Network, and Metering System.????????????????????????????????????????????????????????????????????????????????? Fueling station (gasoline and diesel dispensing) with minimum 500 gal storage for diesel and 500 gal storage for gasoline????????????????????????????????????????????????????????????????????????????????? Security Building, PEB on slab, 387 SFo Electric gate arm, lighting, fencingo CommsReceiving Site Requirements: Besides clearing and grading a little over 2 square miles for the antenna arrays, the following are also required:????????????????????????????????????????????????????????????????????????????????? Operations Facility, Pre-Engineered Building (PEB) on slab, 13,288 SFo Equipment Room, workshop, 1 office (open classified storage), Secure comms closet, Server room, restrooms, break room, logistics, fire/mechanical room, comm room, and electric roomo Utilizes Fluid Cooling units on 8?????????????????????????????????????????????????????????????????????????????????x30????????????????????????????????????????????????????????????????????????????????? concrete pad outside of facility o Specialized cable entry portso Electric, comm, water, sewer (septic system) utilities????????????????????????????????????????????????????????????????????????????????? Water Treatment Building, PEB on slab, 1,323 SFo Fire water storage tank required, commercial off the shelfo Potable water storage tank required, commercial off the shelfo Connect to water well (well installed by others)o Treatment system for potable water????????????????????????????????????????????????????????????????????????????????? Vehicle Maintenance Shelter, PEB on slab, 1,600 SFo One 12?????????????????????????????????????????????????????????????????????????????????x12????????????????????????????????????????????????????????????????????????????????? garage dooro No heatingo Electric and water utilities????????????????????????????????????????????????????????????????????????????????? Vehicle Storage Shelter, PEB on slab, 2,450 SFo Electric utilities only, no heatingo Drive through Overhead Doorso Workbench areas????????????????????????????????????????????????????????????????????????????????? Power Areao Gravel area with all equipment and fuel storage on concrete padso Houses transformers, backup generator system (2 generators, government furnished), 14.4KV load bank (government furnished), (4) 60,000 gal generator fuel storage (double walled), switchgear integrated with SCDA, Network, and Metering System.????????????????????????????????????????????????????????????????????????????????? Fueling station (gasoline and diesel dispensing) with minimum 500 gal storage for diesel and 500 gal storage for gasoline????????????????????????????????????????????????????????????????????????????????? Security Building, PEB on slab, 387 SFo Electric gate arm, lighting, fencing????????????????????????????????????????????????????????????????????????????????? Substation ????????????????????????????????????????????????????????????????????????????????? serves as electrical utility interconnect and site distribution substation, includes enclosure for control shelter (with heating and cooling), fence, power distribution????????????????????????????????????????????????????????????????????????????????? Helicopter Landing Area, 100????????????????????????????????????????????????????????????????????????????????? x 100?????????????????????????????????????????????????????????????????????????????????, minimal earthwork requiredAcquisition Strategy (Pre-Award)USACE will use a streamlined competitive selection process: Step 1-White Papers: Interested parties will submit a Statement of Qualifications (max 10 pages). The government intends to down-select up to three Companies to proceed to Step 2. Step 2-Pitches: Selected Companies will participate in pitch meetings. One company will be selected as the Construction Agent for award of the initial preconstruction services with a modification for construction award. AwardThe agreement will be awarded to the most qualified Construction Agent to provide preconstruction services and construction. Post-award Phase 1 of the CM@R includes Pre-construction services and Post-award Phase 2 includes the construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for construction milestones will be agreed to as the design is finalized and funds are available. Key Qualifications that will be used for the a. Demonstrated experience with heavy civil construction in remote locations. (Experience specific to radar arrays, other OTHR systems, and work with Tribal observers will be given more consideration)b. Demonstrated experience in remote locations requiring establishing and maintaining man camps.c. Demonstrated experience with work in remote locations requiring a tight schedule.d. Demonstrated experience with work in remote locations requiring heavy logistical coordination.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
cbff1e6215054f679032a1ae55fca0c8
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W071 ENDIST KANSAS CITY
Office code
Ingested
Sep 13, 2026
Updated
Sep 13, 2026
Over the Horizon Radar (OTHR) Infrastructure — DEPT OF DEFENSE / DEPT OF THE ARMY · GovBidAlerts