GovBidAlerts
← All opportunities

Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA

Key dates

Posted
Jun 5, 2025
Response deadline
Jun 19, 2025, 6:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Sources Sought
Base type
Sources Sought
Set-aside
Set-aside code
PSC
Y1KA

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2SD ENDIST NORFOLK
Office code
Organization type
OFFICE
Office address
NORFOLK, VA, 23510-1096, USA

Place of performance

Street
Street 2
City
Norfolk
State
VA
Zip
23510
Country
USA

Contacts

Description

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for addiitional information.

Similar open contracts

Metadata

Notice ID
c8c4909dc5cc4c27be47d75bf938332b
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W2SD ENDIST NORFOLK
Office code
Ingested
May 2, 2026
Updated
Jul 11, 2026