This notice has been superseded. See the latest notice: P400--436-24-105 Miles City VA Campus Demolition (Award Notice)
SolicitationActive36C25926R0047
P400--436-24-105 Miles City VA Campus Demolition
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / NETWORK CONTRACT OFFICE 19 (36C259)Key dates?
- Posted?
- May 27, 2026
- Response deadline?
- May 29, 2026, 8:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- P400
NAICS?
Issuing office?
- Department?
- VETERANS AFFAIRS, DEPARTMENT OF
- Sub-tier?
- VETERANS AFFAIRS, DEPARTMENT OF
- Office?
- NETWORK CONTRACT OFFICE 19 (36C259)
- Office code?
- 036.3600.36C259
- Organization type?
- OFFICE
- Office address?
- Greenwood Village, CO, 80111, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- —
- Country?
- —
Contacts?
- Robyn Young (CO)primaryContract Specialist
Description?
36C25926R0047 0003 The purpose of this amendment is to provide a clarification for question 55b regarding footings/foundations/piers/pilings. Question 55b is changed from: The Statement of Work indicates that foundations are to be demolished to one foot below grade except for piles. Please confirm: Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings. Is pile removal explicitly excluded from the scope of work? Yes, unless they are one foot above existing basement soil elevations. If pile removal is excluded, please identify known locations. Refer to the as-built drawings. To: The Statement of Work indicates that foundations are to be demolished to one foot below grade except for piles. Please confirm: Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts. Bldg. 1 has deep foundations and pile footings. Is pile removal explicitly excluded from the scope of work? Yes, unless they are above one foot below grade. If above one foot below grade piles shall be demolished to be one foot below grade. If pile removal is excluded, please identify known locations. Refer to the as-built drawings.
Attachments (53)?
- Download📎 Veterans+Hospital_Part11.pdfapplication/pdf · 39.3 MB
- Download📎 36C25926R0047+0001.pdfapplication/pdf · 887 KB
- Download📎 Veterans+Hospital_Part3.pdfapplication/pdf · 39.8 MB
- Download📎 Well+Information.pdfapplication/pdf · 60 KB
- Download📎 36C25926R0047+0003.docxapplication/octet-stream · 45 KB
- Download📎 13081+VA+MC+Managment+Plan+Update+Report.pdfapplication/pdf · 3.6 MB
- Download📎 Veterans+Hospital_Part1.pdfapplication/pdf · 44.7 MB
- Download📎 12_436GJ_1_TT112_NURSING+HOME+FLOOR+PLANS.pdfapplication/pdf · 881 KB
- Download📎 36C25926R0047.docxapplication/octet-stream · 2.6 MB
- Download📎 6_436GJ_3_TT106_FLOOR+PLAN+BUILDING+3+-+1ST+FLOOR.pdfapplication/pdf · 1.1 MB
- Download📎 S04+-+436-24-105+Miles+City+VA+Campus+Demolition+Site+Visit++Meeting+Doc.pdfapplication/pdf · 152 KB
- Download📎 Veterans+Hospital_Part5.pdfapplication/pdf · 39.4 MB
- Download📎 1_436GJ_1_TT101_MILES+CITY+MONTANA+SYMBOLS+LEGEND+AND+GENERAL+NOTES.pdfapplication/pdf · 619 KB
- Download📎 Veterans+Hospital_Part16.pdfapplication/pdf · 37.6 MB
- Download📎 436-24-105+Miles+City+Campus+Demolition+-SPECS.pdfapplication/pdf · 1.1 MB
- Download📎 10_436GJ_20_TT110_BUILDING+20+FLOOR+PLANS.pdfapplication/pdf · 677 KB
- Download📎 S04+436-24-105+Miles+City+VA+Campus+Demolition+Site+Visit+Attendance.pdfapplication/pdf · 414 KB
- Download📎 14190+Final+Report+-+Reduced.pdfapplication/pdf · 7.1 MB
- Download📎 UCS_Asbestos_Bulk_Results_Bldg_1_Miles_City.pdfapplication/pdf · 66 KB
- Download📎 Veterans+Hospital_Part15.pdfapplication/pdf · 40.0 MB
- Download📎 Section+01+33+23+SHOP+DRAWINGS+PRODUCT+DATA+AND+SAMPLES.pdfapplication/pdf · 164 KB
- Download📎 9_436GJ_10_TT109_BOILER+PLANT+FLOOR+PLANS.pdfapplication/pdf · 776 KB
- Download📎 Veterans+Hospital_Part13.pdfapplication/pdf · 44.4 MB
- Download📎 36C25926R0047+0002.docxapplication/octet-stream · 4.9 MB
- Download📎 0_436GJ_1_TT100_COVER+SHEET.pdfapplication/pdf · 298 KB
- Download📎 Veterans+Hospital_Part4.pdfapplication/pdf · 40.2 MB
- Download📎 436-1948+MILES+CITY+MISC+HVAC+AND+UTLITIES.pdfapplication/pdf · 15.4 MB
- Download📎 5_436GJ_1_TT105_FLOOR+PLAN+BUILDING+1+-+4TH+FLOOR.pdfapplication/pdf · 817 KB
- Download📎 Veterans+Hospital_Part8.pdfapplication/pdf · 44.3 MB
- Download📎 SCA+Wage+Determination+15-5395+12-03-2025.pdfapplication/pdf · 72 KB
- Download📎 Veterans+Hospital_Part9.pdfapplication/pdf · 42.7 MB
- Download📎 S02-3-10-2021+Past+Performance+Questionnaire_Blank_Fillable+PDF.pdfapplication/pdf · 264 KB
- Download📎 13_436GJ_TT113_SITE+PLAN.pdfapplication/pdf · 1.0 MB
- Download📎 S22-+852.219-75+LOS+Certification.pdfapplication/pdf · 146 KB
- Download📎 VHA+PCRA-1.1+Miles+City+Campus+Demolition.pdfapplication/pdf · 308 KB
- Download📎 Veterans+Hospital_Part2.pdfapplication/pdf · 42.1 MB
- Download📎 Veterans+Hospital_Part17.pdfapplication/pdf · 42.5 MB
- Download📎 Veterans+Hospital_Part7.pdfapplication/pdf · 39.2 MB
- Download📎 Veterans+Hospital_Part6.pdfapplication/pdf · 39.3 MB
- Download📎 Veterans+Hospital_Part10.pdfapplication/pdf · 40.0 MB
- Download📎 Veterans+Hospital_Part18.pdfapplication/pdf · 6.9 MB
- Download📎 Miles+City+VA+Phase+2+ESA+Report+-Final+122719.pdfapplication/pdf · 8.2 MB
- Download📎 436-24-105+Miles+City+Campus+Demolition+-+APPENDIX+A.pdfapplication/pdf · 4.6 MB
- Download📎 2_436GJ_1_TT102_BUILDING+1+CABLE+PLANT+INFRASTRUCTURE.pdfapplication/pdf · 1.0 MB
- Download📎 11_436GJ_OPC_TT111_FLOOR+PLAN+BUILDING+OPC+-+1ST+FLOOR.pdfapplication/pdf · 668 KB
- Download📎 4_436GJ_1_TT104_FLOOR+PLAN+BUILDING+1+3RD+FLOOR.pdfapplication/pdf · 928 KB
- Download📎 Miles+City+Asbestos+Inspection+Report+Addendum+4-20-13.pdfapplication/pdf · 773 KB
- Download📎 7_436GJ_8_TT107_FLOOR+PLANS+BUILDING+8.pdfapplication/pdf · 1.1 MB
- Download📎 Veterans+Hospital_Part12.pdfapplication/pdf · 42.0 MB
- Download📎 Veterans+Hospital_Part14.pdfapplication/pdf · 39.7 MB
- Download📎 3_436GJ_1_TT103_SECOND+FLOOR+PLAN.pdfapplication/pdf · 999 KB
- Download📎 Miles+City+VA+Asbestos+Abatement+Final+Drawings+-+May+2013+-+Volume+1+of+2.pdfapplication/pdf · 4.6 MB
- Download📎 S22-+852.219-75+LOS+Certification.docxapplication/octet-stream · 17 KB
Other notices in this solicitation?
- Award NoticeP400--436-24-105 Miles City VA Campus DemolitionJun 16, 2026LATEST
- SolicitationP400--436-24-105 Miles City VA Campus DemolitionMay 19, 2026
- SolicitationP400--436-24-105 Miles City VA Campus DemolitionMay 19, 2026
- SolicitationP400--436-24-105 Miles City VA Campus DemolitionApr 29, 2026
- SolicitationP400--436-24-105 Miles City VA Campus DemolitionMar 31, 2026
- PresolicitationP400--436-24-105 Miles City VA Campus DemolitionMar 26, 2026
- PresolicitationP400--436-24-105 Miles City VA Campus DemolitionFeb 5, 2026
Similar open contracts
Metadata?
- Notice ID?
- bbdadb09d3e84c51b8c777d3f5cada8a
- Full path?
- VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.NETWORK CONTRACT OFFICE 19 (36C259)
- Office code?
- 036.3600.36C259
- Ingested?
- May 28, 2026
- Updated?
- Jun 27, 2026