GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS (Solicitation)

CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS

Key dates

Posted
Mar 30, 2026
Response deadline
Apr 30, 2026, 8:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Presolicitation
Set-aside
No Set aside used
Set-aside code
NONE
PSC
Y1LB

NAICS

Issuing office

Department
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Office code
Organization type
OFFICE
Office address
LAKEWOOD, CO, 80228, USA

Place of performance

Street
Street 2
City
Cima
State
CA
Zip
92323
Country
USA

Contacts

Description

THIS IS AN INVITATION FOR BID ’ PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
af6ac1920200468a85a636cca550df05
Full path
TRANSPORTATION, DEPARTMENT OF.FEDERAL HIGHWAY ADMINISTRATION.6982AF CENTRAL FEDERAL LANDS DIVISI
Office code
Ingested
May 2, 2026
Updated
May 3, 2026