Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Key dates

Posted
Jan 15, 2026
Response deadline
Feb 18, 2026, 6:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Set-aside code
PSC
Y1QA

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2SD ENDIST NEW ENGLAND
Office code
Organization type
OFFICE
Office address
CONCORD, MA, 01742-2751, USA

Place of performance

Street
Street 2
City
Bourne
State
MA
Zip
Country
USA

Contacts

Description

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be constructed within the grounds of CCSFS in facilities which are in restricted areas requiring enhanced security protocols. The impacted facilities are to remain occupied throughout construction with minimal disruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery energy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all facility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid controls, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered generators, uninterrupted power supplies, critical and non-critical power distribution resources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mission critical operations and impacted protective HEMP barriers.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
ae4d5db171fd40bfaf7d111576b39f52
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W2SD ENDIST NEW ENGLAND
Office code
Ingested
May 2, 2026
Updated
Jul 11, 2026