GovBidAlerts
← All opportunities

Heise Roberts Levee Rehab

Key dates

Posted
May 28, 2026
Response deadline
Jun 4, 2026, 11:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Sources Sought
Base type
Sources Sought
Set-aside
Set-aside code
PSC

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
US ARMY ENGINEER DISTRICT WALLA WAL
Office code
Organization type
OFFICE
Office address
WALLA WALLA, WA, 99362-1876, USA

Contacts

Description

Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
a47e3d0bcd064fdb8b1d7096abef29ec
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY ENGINEER DISTRICT WALLA WAL
Office code
Ingested
Jun 12, 2026
Updated
Jul 11, 2026