UT NP ARCH 100(2) Bridges on Delicate Arch Road

Key dates

Posted
Sep 8, 2026
Response deadline
Sep 23, 2026, 8:00 PM UTC
Archive date
Oct 8, 2026
Archive type
auto15

Classification

Notice type
Presolicitation
Base type
Presolicitation
Set-aside
No Set aside used
Set-aside code
NONE
PSC
Y1LB

NAICS

Issuing office

Department
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Office code
069.6925.6982AF
Organization type
OFFICE
Office address
LAKEWOOD, CO, 80228, USA

Place of performance

Street
—
Street 2
—
City
Moab
State
Utah
Zip
—
Country
UNITED STATES

Contacts

Description

PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
9c354b9dd5844ea2aaf634299dcddf9e
Full path
TRANSPORTATION, DEPARTMENT OF.FEDERAL HIGHWAY ADMINISTRATION.6982AF CENTRAL FEDERAL LANDS DIVISI
Office code
069.6925.6982AF
Ingested
Sep 9, 2026
Updated
Sep 13, 2026