GovBidAlerts
← All opportunities

Demolition, Removal, and Remediation

Key dates

Posted
Jul 23, 2026
Response deadline
Aug 4, 2026, 5:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Combined Synopsis/Solicitation
Base type
Combined Synopsis/Solicitation
Set-aside
Set-aside code
PSC
F999

NAICS

Issuing office

Department
TRANSPORTATION, DEPARTMENT OF
Sub-tier
OFFICE OF THE SECRETARY
Office
6913G6 VOLPE NATL. TRANS. SYS CNTR
Office code
069.6901.6913G6
Organization type
OFFICE
Office address
CAMBRIDGE, MA, 02142, USA

Place of performance

Street
Street 2
City
Glens Falls
State
New York
Zip
12801
Country
UNITED STATES

Contacts

Description

The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition. The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix. Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. See SOW for details.

Attachments (4)

Similar open contracts

Metadata

Notice ID
98cbd07492794cedbe9a88f3f63bac7e
Full path
TRANSPORTATION, DEPARTMENT OF.OFFICE OF THE SECRETARY.6913G6 VOLPE NATL. TRANS. SYS CNTR
Office code
069.6901.6913G6
Ingested
Jul 24, 2026
Updated
Jul 24, 2026