This notice has been superseded. See the latest notice: LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP) (Solicitation)
PresolicitationActiveW912P926RA001
LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
DEPT OF DEFENSE / DEPT OF THE ARMY / W07V ENDIST ST LOUISKey dates?
- Posted?
- Jan 15, 2026
- Response deadline?
- Mar 31, 2026, 4:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Presolicitation
- Base type?
- Sources Sought
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- Y1PZ
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W07V ENDIST ST LOUIS
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- SAINT LOUIS, MO, 63103-2833, USA
Place of performance?
- Street?
- Lock and Dam 25, Winfield, MO 63389
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- 63389
- Country?
- —
Contacts?
- Angie Grimesprimary
- Whitney Deesecondary
Description?
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.
Other notices in this solicitation?
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Apr 23, 2026LATEST
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Apr 16, 2026
- PresolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Apr 14, 2026
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Apr 10, 2026
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Mar 27, 2026
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Mar 4, 2026
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Feb 24, 2026
- SolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Feb 23, 2026
- PresolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Feb 23, 2026
- PresolicitationLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Jan 22, 2026
- Sources SoughtLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Sep 5, 2025
- Sources SoughtLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Mar 5, 2025
- Sources SoughtLOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)Feb 26, 2025
Similar open contracts
Metadata?
- Notice ID?
- 94e7c6a9687b495a8eaf240a54433841
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W07V ENDIST ST LOUIS
- Office code?
- —
- Ingested?
- May 2, 2026
- Updated?
- Jul 11, 2026