This notice has been superseded. See the latest notice: The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities (Combined Synopsis/Solicitation)
Sources SoughtActiveW911S226RA005
The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
DEPT OF DEFENSE / DEPT OF THE ARMY / W6QM MICC-FT DRUMKey dates?
- Posted?
- Jan 9, 2026
- Response deadline?
- Jan 30, 2026, 8:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Sources Sought
- Base type?
- Sources Sought
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- C1EA
NAICS?
- 541330Engineering Services
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W6QM MICC-FT DRUM
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- FORT DRUM, NY, 13602-5220, USA
Place of performance?
- Street?
- Radford Army Ammunition Plant, Radford, VA
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- 24141
- Country?
- —
Contacts?
- Lyndsie Hallprimary
- A. Milan Sanchezsecondary
Description?
The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Other notices in this solicitation?
- Combined Synopsis/SolicitationThe Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 FacilitiesApr 7, 2026LATEST
- Combined Synopsis/SolicitationThe Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 FacilitiesMar 12, 2026
Similar open contracts
Metadata?
- Notice ID?
- 8966196b57b64e34915824c62bc7b111
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W6QM MICC-FT DRUM
- Office code?
- —
- Ingested?
- May 2, 2026
- Updated?
- Jul 11, 2026