This notice has been superseded. See the latest notice: Repair Cracks and Spalling B 43430 (Solicitation)
SolicitationActiveFA527025R0020
Repair Cracks and Spalling B 43430
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA5270 18 CONS PKKey dates?
- Posted?
- Jul 9, 2025
- Response deadline?
- Jul 21, 2025, 5:00 AM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- No Set aside used
- Set-aside code?
- NONE
- PSC?
- Z2JZ
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE AIR FORCE
- Office?
- FA5270 18 CONS PK
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- APO, AP, 96368-5199, USA
Place of performance?
- Street?
- Kadena Air Base, Okinawa Japan
- Street 2?
- —
- City?
- Kadena Air Base
- State?
- JP-47
- Zip?
- 96368
- Country?
- JPN
Contacts?
- Christopher Nicolasprimary
- Emily Rubinosecondary
Description?
Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
Other notices in this solicitation?
- SolicitationRepair Cracks and Spalling B 43430Jul 11, 2025LATEST
- SolicitationRepair Cracks and Spalling B 43430Jun 18, 2025
- SolicitationRepair cracks and spalling B 43430Jun 18, 2025
Similar open contracts
Metadata?
- Notice ID?
- 6013cc645f8d43f09640cf6df4f21162
- Full path?
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA5270 18 CONS PK
- Office code?
- —
- Ingested?
- May 2, 2026
- Updated?
- Jul 11, 2026