GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: Cancelled Rosebud Lift Station Construction (Solicitation)

Rosebud Lift Station Construction

Key dates

Posted
Feb 11, 2026
Response deadline
Mar 2, 2026, 10:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Indian Small Business Economic Enterprise (ISBEE) Set-Aside (specific to Department of Interior and Indian Health Services)
Set-aside code
ISBEE
PSC
Y1ND

NAICS

Issuing office

Department
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Sub-tier
INDIAN HEALTH SERVICE
Office
DIV OF ENGINEERING SVCS - SEATTLE
Office code
Organization type
OFFICE
Office address
SEATTLE, WA, 98121, USA

Place of performance

Street
Street 2
City
Rosebud
State
SD
Zip
57570
Country
USA

Contacts

Description

Amendment 2: Adds the provision 52.228-1 in full text. Added MB01-A02 Bid Bond RLSC 75H70126R00018 to the attachments. Remember to acknowledge this and all future amendments with your proposal. Amendment 1: Replace an attachment. Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or concerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment. Remember to acknowledge this and all future amendments with your proposal. Solicitation: Rosebud LiftStation Construction Location: 1319 Soldier Creek Road,Rosebud, SD 57570 County: Todd POP: 120 calendar days Construction Magnitude: Between$500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See SectionH.50. Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
5e868fea7dea41d58dda0f6da383d2a2
Full path
HEALTH AND HUMAN SERVICES, DEPARTMENT OF.INDIAN HEALTH SERVICE.DIV OF ENGINEERING SVCS - SEATTLE
Office code
Ingested
May 2, 2026
Updated
Jul 11, 2026