GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: Fire Alarm System Replacement, Mountain Home AFB (Solicitation)

Fire Alarm System Replacement, Mountain Home AFB

Key dates

Posted
Oct 16, 2025
Response deadline
Dec 1, 2025, 10:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
No Set aside used
Set-aside code
NONE
PSC
J063

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA4897 366 CONS PKP
Office code
Organization type
OFFICE
Office address
MOUNTAIN HOME AFB, ID, 83648-5296, USA

Place of performance

Street
Street 2
City
Mountain Home AFB
State
ID
Zip
83648
Country
USA

Contacts

Description

Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 7, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), November 28, 2025. Questions shall be directed to both POCs.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
5ad7bc725caa4a94a8a01f82464d11a1
Full path
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA4897 366 CONS PKP
Office code
Ingested
May 2, 2026
Updated
Jul 11, 2026