GovBidAlerts
← All opportunities

Argon Piping Supply, Installation and Testing

Key dates

Posted
Apr 1, 2026
Response deadline
Apr 30, 2026, 8:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Sources Sought
Base type
Sources Sought
Set-aside
Set-aside code
PSC

Issuing office

Department
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Office code
Organization type
OFFICE
Office address
Batavia, IL, 60510, USA

Place of performance

Street
Street 2
City
Lead
State
SD
Zip
Country
USA

Contacts

Description

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8’ diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6’ diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8’ diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF’ outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above

Similar open contracts

Metadata

Notice ID
42d2549de2d24ca88b37d36772f00fb0
Full path
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
Office code
Ingested
May 2, 2026
Updated
May 3, 2026