Combined Synopsis/SolicitationActive23Z3AJ2
FCC Yazoo City - Air Cooled Condensors Replacement
JUSTICE, DEPARTMENT OF / FEDERAL PRISON SYSTEM / BUREAU OF PRISONS / FCC YAZOO CITYKey dates?
- Posted?
- Jun 9, 2026
- Response deadline?
- Jun 22, 2026, 5:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- 4120
NAICS?
Issuing office?
- Department?
- JUSTICE, DEPARTMENT OF
- Sub-tier?
- FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
- Office?
- FCC YAZOO CITY
- Office code?
- 015.1540.15B315
- Organization type?
- OFFICE
- Office address?
- YAZOO CITY, MS, 39194, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Yazoo City
- State?
- Mississippi
- Zip?
- 39194
- Country?
- UNITED STATES
Contacts?
- Carlos Tateprimary
Description?
The primary objective of this project is to replace the aging and non-functioning geothermal system at the Federal Prison Camp (FPC) in Yazoo City, Mississippi (p. 1). The contractor will install a new system utilizing three air-cooled condensers to service approximately 15,500 square feet of the Camp Core and Education buildings, while capping and abandoning the original geothermal system in place (p. 1). Key Specifications & Requirements Equipment: High-efficiency, sickle-blade AC fan motors (e.g., ZIEHL-ABEGG) operating at 550 RPM, enclosed in 16-gauge galvanized steel casings (p. 1). Electrical & Sound: Systems must run on 460 main power and maintain a maximum sound pressure level of 46 dBA at 10 meters (p. 1). Pressure Testing: High heat transfer tube and fin coils must be factory leak-tested and sealed at 600 psig (p. 1). Contractor Duties: Pouring concrete equipment pads, core drilling walls, connecting and insulating refrigeration/electrical lines, factory startup, and providing all necessary tools and safety equipment (p. 2). Operational Rules & Constraints Work Hours: Monday through Friday, 7:30 am to 3:30 pm (excluding federal holidays), with a total project timeline not to exceed 150 calendar days (pp. 3-4). Security & Clothing: Workers must be escorted at all times (p. 3). Khaki, olive-green, camouflage, and sleeveless clothing are strictly prohibited (p. 3). Contraband: No electronic devices (cellphones, laptops, tablets), tobacco/vapor products, weapons, or unapproved medications are allowed on site (p. 3). Attached is the SOW. Site visit will be held 6/16/26 at 10 AM CST. Please contact B. Wiles @ bhwiles@bop.gov if interested no later than 6/12/26 12 Noon CST.
Attachments (1)?
- Download📎 23Z3AJ2+YAZ+SOW+Install+Air+Cooled+Condensors.pdfapplication/pdf · 140 KB
Other notices in this solicitation?
Similar open contracts
Metadata?
- Notice ID?
- 3d6f9498720448e584761f6920fa5561
- Full path?
- JUSTICE, DEPARTMENT OF.FEDERAL PRISON SYSTEM / BUREAU OF PRISONS.FCC YAZOO CITY
- Office code?
- 015.1540.15B315
- Ingested?
- Jun 10, 2026
- Updated?
- Jul 7, 2026