GovBidAlerts
← All opportunities

Fire Suppression, Fire Alarm, Fire Sprinkler Systems Maintenance Service and Repair For Joint Base Lewis-McChord (JBLM) and Yakima Training Center (YTC), Washington

Key dates

Posted
May 26, 2022
Response deadline
Jun 6, 2022, 7:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
8a Competed
Set-aside code
8A
PSC
J012

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W6QM MICC-JB LEWIS-MC CHORD
Office code
Organization type
OFFICE
Office address
JOINT BASE LEWIS MCCH, WA, 98433-9500, USA

Place of performance

Street
Street 2
City
Joint Base Lewis McChord
State
WA
Zip
98433
Country
USA

Contacts

Description

The Contractor shall provide all personnel, equipment, tools, materials, supervision, and personnel services necessary to examine, restore, maintain, repair, clean, inspect, and test the following: installed facility fire sprinkler systems, kitchen fire suppression systems, fire pumps, fire pump monitoring devices and related equipment, fire sprinkler monitoring devices, aircraft hangar Aqueous Film Forming Foam (AFFF) systems (to include annual lab testing of the foam concentrate agent), automatic fire alarms, Fire Alarm Control Panels (FACP) including the software and associated devices, (activation, warning and auxiliary), and electrical/electronic components of the systems. The Contractor shall provide testing and programming to facilities with Mass Notification Systems (MNS). The Contractor shall provide updated Computer-Aided Design (CAD) (current year) drawings in a manner that will ensure fire systems serviceability and proper operation. Contractor shall provide a list of major component manufacturers and system components, year of installation as near as can be determined, as well as ITM cycle for sprinkler and suppression systems. Contractor shall submit reports to the Contracting Officers Representative (COR) at JBLM, Washington (WA) and leave a copy of the CAD drawing at the FACP in each building. All work shall comply with and be in accordance with (IAW) the Unified Facilities Criteria (UFC) 3-601-02 Operations and Maintenance: Inspection, Testing, and maintenance of Fire Protections Systems, National Fire Protection Association (NFPA) Standards 10 through 25, 70, 72, 96, JBLM requirements and the manufacturer’s instructions. The Unified Facilities Criteria (UFC) 3-601-02 shall take first precedence over other guidance. Technical Exhibit 1 (TE-1) shows the JBLM and YTC, WA facilities list. Technical Exhibit 2 (TE-2) shows the Kitchen Hood Listing.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
3a5cd71a69834f5a84f515bab95e4058
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W6QM MICC-JB LEWIS-MC CHORD
Office code
Ingested
May 2, 2026
Updated
Jul 11, 2026