H312--Fire System Inspection & Testing

Key dates

Posted
Apr 28, 2026
Response deadline
May 6, 2026, 2:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Set-aside code
PSC
H312

NAICS

Issuing office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
252-NETWORK CONTRACT OFFICE 12 (36C252)
Office code
Organization type
OFFICE
Office address
MILWAUKEE, WI, 53214, USA

Contacts

Description

RESPONSE: Per NFPA 25 13.4.5.2.2.2 a full trip test of dry systems is required every three years, and an air leakage test of dry systems every three years per NFPA 13.4.5.2.9.’ for the following buildings.’ Years for testing shall be Base Year FY26, and Option Year 3 FY29. Building 14 Building 22/69 Building 49 Building 60 Building 128 Building 129 Building 130 Building 131 (This is in SOW, written this way, for the full dry trip test).’ (This is not in the SOW but NFPA 25 states)- 13.4.3.2.3- During the years when full flow testing in accordance with 13,4,4,2,2 is not required, the Preaction valve shall be trip tested with the control valve partially open. As far as the quarterly, semi-annual, annual testing it would make no sense to do a quarterly test, then right after doing a semi-annual test, then right after doing an annual test performing the same test on the same visit. ’ Unless mistaken, there are no tests that would be a quarterly test, and a semi-annual test, and/or an annual test. REQUEST FOR CLARIFICATION: 1. Inspection Frequency Overlap (Quarterly, Semi-Annual, Annual) The CLIN structure appears to define inspection frequencies as separate and cumulative as follows: Annual = 1 occurrence Semi-Annual = 2 occurrences Quarterly = 4 occurrences However, per NFPA, these inspection intervals are not additive, but rather inclusive, where higher frequency inspections (quarterly) inherently satisfy the requirements of lower frequency intervals (semi-annual and annual). Concern: The current structure appears to require performance and pricing of: 4 quarterly inspections PLUS 2 semi-annual inspections PLUS 1 annual inspection This results in 7 total inspection events annually, which exceeds NFPA requirements and standard industry practice.’ Per NFPA guidelines exclusively the following is the standard: Fire Alarm Systems: 2 Inspections per year Annual Semi-Annual Fire Sprinkler Systems: 4 Inspections per year Annual Quarterly 1 Semi-Annual Quarterly 2 Kitchen Hoods: 2 Inspections per yer Annual Semi-Annual 2. Dry Pipe Trip Testing (3-Year Frequency) The CLIN structure includes dry pipe valve trip testing in: Base Year All Option Years Per NFPA 25, dry pipe valve trip testing is required once every 3 years, not annually. Concern: Including this requirement in every contract year appears to conflict with NFPA 25 and may result in: Unnecessary system disruption Increased wear on equipment Inflated pricing Request for Clarification: Should dry pipe trip testing be performed strictly on a 3-year cycle (e.g., Base Year and Option Year 3)? Or is the Government requiring annual trip testing regardless of NFPA guidance?

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
3411ddcc4f4447fd9559156fda361d64
Full path
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.252-NETWORK CONTRACT OFFICE 12 (36C252)
Office code
Ingested
May 2, 2026
Updated
May 3, 2026